Reroof and solar together in Los Angeles County: how often a solar permit comes with a new roof, 2023–2026

Cali-Graf · Published Nov 11, 2026 · Data as of Aug 31, 2026

In unincorporated Los Angeles County, 12% of the new solar installs on existing homes applied for from January 2024 to March 2026 had a reroof permit on the same property from 12 months before to 3 months after the solar application. For the same homes two to three years earlier, a reroof permit turned up in a window of the same length 2% of the time. In Glendale the share with a reroof was 21% and in La Cañada Flintridge 26%; in El Monte 15% and in Alhambra 9%. In the county, 45% of these roofs were filed within 30 days of the solar application.

12%
Solar installs with a reroof, unincorporated LA County
Reroof from a year before to 3 months after, Jan 2024 – Mar 2026
2%
Same homes 2–3 years earlier
Reroof in a window of the same length
45%
Of county solar installs with a reroof: roof filed within 30 days
Unincorporated LA County, Jan 2024 – Mar 2026
In this guide
Solar installs with a reroof, January 2024 to March 2026When the roof permit was filedBy year of the solar applicationSeen from the roof sideCheck a roof-and-solar pipeline against these numbersData limitsQuestionsMethodologySourcesHow to cite this page

Solar installs with a reroof, January 2024 to March 2026#

JurisdictionNew solar installsWith a reroof permitSame homes 2–3 years earlierRoof filed within 30 days
Unincorporated LA County6,56412%2%45%
Glendale1,40121%4%34%
Alhambra2939%2%42%
El Monte24415%—41%
La Cañada Flintridge34426%4%42%
All five8,84614%2%42%

New residential solar installs on existing homes, applied for from Jan 1, 2024 to Mar 31, 2026 and issued by Aug 31, 2026. With a reroof permit — a reroof application on the same parcel or street address from 12 months before to 3 months after the solar application. Same homes 2–3 years earlier — a reroof application in a window of the same length (455 days) that ends two years before the solar application; shown where the roof records reach that far back for at least 100 installs (El Monte's start in July 2023). Roof filed within 30 days — share of the installs with a reroof. Glendale's regular solar permit type covers all buildings and its regular roofing type all structures. New construction, removals and reinstalls of existing systems, and voided permits are left out (Data limits). Source: LA County EPIC-LA Case History, downloaded Sep 2, 2026; EnerGov permit portals of the four cities, copied Oct 17, 2026.

Download this table (CSV)

In unincorporated areas, Glendale and La Cañada Flintridge, a reroof permit was at least three times as common around a solar application as on the same homes two years earlier: 2%, 4% and 4%. Alhambra's earlier share rests on 5 of 279 installs. The records show that the two permits sit close together on the same property; they do not show who did the roof or why it was replaced. Across the five jurisdictions, 14% of 8,846 new installs had a reroof permit in the window.

Model the roof you will install on
Cali-Graf lays out panels on the roof from satellite imagery, models the battery under the Net Billing Tariff and builds the customer proposal.
Open Cali-Graf

When the roof permit was filed#

JurisdictionSolar with a reroof6–12 months before1–6 months beforeWithin 30 days1–3 months after
Unincorporated LA County78014%31%45%11%
Glendale29417%39%34%10%
Alhambra2623%27%42%8%
El Monte378%22%41%30%
La Cañada Flintridge888%36%42%14%
All five1,22514%33%42%11%

New solar installs with a reroof permit, applied for from Jan 2024 to Mar 2026, by when the nearest reroof application on the same property was filed relative to the solar application: 6–12 months before — 181 to 365 days; 1–6 months before — 31 to 180 days; within 30 days — before or after; 1–3 months after — 31 to 90 days. Source: LA County EPIC-LA; EnerGov portals of the four cities.

Download this table (CSV)

In unincorporated areas the most common case was a roof filed within 30 days of the solar application; in 45% of the county's pairs the roof was filed more than a month before. In Glendale the most common case was a roof filed one to six months before the solar application, 39% of its pairs.

By year of the solar application#

Jurisdiction202320242025Jan–Mar 2026
Unincorporated LA County15%4,604 installs13%3,476 installs11%2,691 installs10%397 installs
Glendale22%418 installs17%476 installs23%828 installs21%97 installs
Alhambra17%198 installs6%124 installs11%141 installs14%28 installs
El Monte—no full-year roof records6%66 installs, from Jul17%153 installs28%25 installs
La Cañada Flintridge20%203 installs24%93 installs26%215 installs31%36 installs

Share of new solar installs on existing homes with a reroof permit from 12 months before to 3 months after the solar application, by year of the application, with the number of installs below each share; 2026 covers January to March. El Monte's current reroof records start in July 2023, so only its applications from a year later are counted. Source: LA County EPIC-LA; EnerGov portals of the four cities.

Download this table (CSV)

In unincorporated areas the share fell from 15% for applications in 2023 to 11% for those in 2025. The records do not say why.

Seen from the roof side#

Of the 3,999 residential reroof applications in unincorporated areas in 2024, 11% had a new solar application on the same property from 3 months before to 12 months after the roof. In La Cañada Flintridge the share was 13% of 204 reroofs, in El Monte 5% of 279 and in Alhambra 2% of 503. Glendale is not shown: its regular roofing permit type covers all structures.

LA County's building code manual requires a separate permit for reinstalling an existing array that is taken off for a reroof, in addition to the reroof permit; it names a C-39 roofing contractor for the reroof and a C-10 or C-46 contractor for the reinstallation, unless an A or B contractor applies for both. In the records, the reinstallation shows up as a separate permit: through most of 2024 as a building or electrical permit, and from late 2024 almost always as a solar permit, so the county's solar permits for it rose from 32 for applications in 2024 to 107 in 2025 as the work moved into that type. Some reroof permits also mention the reinstallation in their description, often with the number of the separate permit. 69% of the separate solar permits had a reroof permit on the same property in the same window.

Check a roof-and-solar pipeline against these numbers#

To compare a sales pipeline with these figures, count the solar jobs on existing homes that had a reroof permit on the same property in the year before the solar application or the three months after, and compare the share with the jurisdiction's row. The timing table shows when the roof permit usually went in. For permit waits in the same jurisdictions, the solar permit time page has days from application to issue by path.

Data limits#

The county figures come from LA County's EPIC-LA case history as downloaded on Sep 2, 2026, for unincorporated areas; the city figures come from the public EnerGov portals of Glendale, Alhambra, El Monte and La Cañada Flintridge, copied on Oct 17, 2026. The City of Los Angeles and the cities whose express solar permits run through the county are not covered. Only permitted work is counted: a roof replaced without a permit, or a permit in another jurisdiction's records, is not seen. The records do not say whether one contractor did both jobs. A reroof on any structure of the property counts, a detached garage included, and on a parcel with several units the two permits can be for different units.

In the county, a reroof is a residential repair-or-replacement permit whose description names the roof work (Methodology); 8,999 such cases were filed from January 2024 and issued by August 2026. The cities have their own reroof permit types; Glendale's regular type covers all structures. A property is matched by parcel number or by house number and street. Matching by parcel only or by street address only changes a jurisdiction's share by at most 5 percentage points. With a look-back of six months instead of twelve, the county's share would be 10%; with two years, 14%.

New construction is left out with the rule of the solar permit time page: a solar application within three years after an application for a new building on the same parcel, or, in the county, an address that names a subdivision lot — 2,400 solar permits applied for from January 2023 to March 2026. Permits to remove and reinstall an existing system are left out of the installs: 201, found by their description. La Cañada Flintridge's solar permits carry no description (100% of them), so its removals and reinstalls cannot be found and stay in its count. El Monte's current reroof records start in July 2023; its 157 solar permits applied for before a full year of roof records are left out, and it has no earlier-years comparison. Also left out: 2,147 solar permits voided, canceled, withdrawn, denied or refunded, and permits not issued by Aug 31, 2026.

How often does a solar install come with a new roof in Los Angeles County?

For new solar installs on existing homes applied for from January 2024 to March 2026, 12% in unincorporated areas had a reroof permit on the same property from a year before to three months after the solar application; in Glendale 21% and in La Cañada Flintridge 26%.

Is the roof permit usually filed before or after the solar permit?

Mostly before or at the same time: in the county, 45% of the roofs were filed within 30 days of the solar application and 45% more than a month before.

How many reroofs lead to solar?

Of the residential reroof applications in unincorporated areas in 2024, 11% had a new solar application on the same property from 3 months before to 12 months after the roof.

Methodology#

Solar permits are the residential permit types of the solar permit time page: in the county, EPIC-LA cases with case name “Unincorporated Express” and an “Express Solar Roof Mount Residential” work class, or “Unincorporated Solar” with “Roof Mount Residential”; in the cities, Glendale's “Express Residential Solar Photovoltaic (PV) Permit (Single Family Dwelling only)” and “Solar Photovoltaic (PV) Permit”, Alhambra's “PHOTOVOLTAIC - SolarAPP+” and “Solar Permit - Residential”, El Monte's “SolarAPP+ Residential Solar Permit” and “Solar Residential”, and La Cañada Flintridge's “SolarAPP+” and “Solar Panel - RESIDENTIAL”. The case history layer lists a case once per parcel or address it covers; each case number is counted once, with every parcel and address of its rows. Reroof permits are, in the county, cases with case name “Unincorporated Building Residential” and work class “Repair/Replacement” whose description names a reroof (“reroof”, “re-roof”, “R-roof”), a roof replacement, a tear-off (“tear off”, “T/O”), removal of the existing roofing, a tile reset, lift or re-lay, a cool roof, a Cool Roof Rating Council (CRRC) product number, or composition, architectural, dimensional, laminated or asphalt shingles, leaving out cases marked for another city's jurisdiction; in the cities, Glendale's “Roofing Permit (All Structures)” and “Express Re-Roof Permit (Single Family Dwelling only)”, Alhambra's “Reroof Permit - Residential”, El Monte's “Re Roof Residential” and La Cañada Flintridge's “Roof-Building (RESIDENTIAL)”. Both kinds must be issued by Aug 31, 2026 and not voided, canceled, withdrawn, denied or refunded. A removal and reinstallation is a solar permit whose description says reinstall, R&R, remove and re-, detach and re- or reset. The type in which the county filed reinstallations is read from issued, not voided Building General “Special Purpose”, Electrical “Simple” and Solar “Roof Mount Residential” cases whose description says reinstall, R&R, remove and reinstall, or detach and reset or reinstall, together with solar, PV, photovoltaic, modules or panels. A property is the same when the parcel number matches or the house number and street match, after upper-casing, dropping punctuation and unit numbers and abbreviating street types and directions. A solar application counts only when the jurisdiction's reroof records start at least 12 months before it. Dates are application dates in Los Angeles time; shares are over installs.

Sources#

  1. Los Angeles County Public Works — EPIC-LA Case History layer, downloaded Sep 2, 2026. https://services.arcgis.com/RmCCgQtiZLDCtblq/arcgis/rest/services/EPIC-LA_Case_History_view/FeatureServer/0
  2. City of Glendale — EnerGov permit portal. https://glendaleca-energovweb.tylerhost.net/apps/selfservice
  3. City of Alhambra — EnerGov permit portal. https://alhambraca-energovpub.tylerhost.net/apps/selfservice
  4. City of El Monte — EnerGov permit portal. https://elmonteca-energovweb.tylerhost.net/apps/selfservice
  5. City of La Cañada Flintridge — EnerGov permit portal. https://lacanadaflintridgeca-energovpub.tylerhost.net/apps/selfservice
  6. Los Angeles County Public Works, Building and Safety — Building Code Manual 1512, Reroofing on Roofs With or Without Solar Energy Systems (Apr 1, 2025): separate permit for reinstalling a removed rooftop PV system; C-39 for the reroof, C-10 or C-46 for the reinstallation, A or B for both. https://ladpw.org/bsd/lib/fp/Building/Building%20Code%20Manuals/2023/BCM%201512%20A1%20-%20Reroofing%20on%20Roofs%20With%20or%20Without%20Solar%20Energy%20Systems%20(04-01-25).pdf

How to cite this page#

Cali-Graf. “Reroof and solar together in Los Angeles County: how often a solar permit comes with a new roof, 2023–2026.” cali-graf.com, updated Nov 11, 2026. https://cali-graf.com/guides/reroof-and-solar-together-los-angeles-county/