Home solar and battery permits in Anaheim, 2020–2026
Applications for new home solar installs in Anaheim fell from 638 in 2020 to 212 in 2025 (−67%), while the share that included a battery rose from 4% to 39%. The median new system grew from 17 modules in 2020 to 21 in 2022, then shrank to 13 in 2025.
Anaheim Public Utilities operates the only municipal electric system in Orange County, and the state's DG Stats interconnection data covers only customers of PG&E, SCE and SDG&E, so it does not include the city utility's customers. The city's building permits are the public record of rooftop solar there.
In this guide
New installs by year#
Swipe to see all columns →
| Application year | Applications | New installs | Removal or reinstall | On a new home | New installs finaled | New installs expired |
|---|---|---|---|---|---|---|
| 2020 | 647 | 638 | 9 | 0 | 94% | 5% |
| 2021 | 467 | 462 | 5 | 0 | 87% | 12% |
| 2022 | 300 | 291 | 7 | 2 | 90% | 9% |
| 2023 | 338 | 291 | 38 | 9 | 87% | 11% |
| 2024 | 290 | 228 | 54 | 8 | 81% | 15% |
| 2025 | 249 | 212 | 37 | 0 | 60% | 3% |
| 2026, to May 15 | 112 | 93 | 12 | 7 | 3% | 0% |
Single-family residential permits of the City of Anaheim's three photovoltaic types of work ("Photovoltaic System", "Photovoltaic with Micro-Inverters" and the city's own spelling "Phototvoltaic with Micro-Inverters"), by the date the application was received; 2026 runs to May 15, 2026. Applications — not voided, withdrawn or unpaid (NSF). Removal or reinstall — the description names removing and reinstalling, removing or relocating existing solar. On a new home — solar for a new accessory dwelling unit, a new tract home or new construction. New installs — the rest. Finaled and expired — the status of new installs in the copy of May 17, 2026; recent permits are still open. Source: City of Anaheim Building Permit Report.
New installs fell each year from 2020 to 2022 and were lowest in 2025 among the full years. Removal or reinstall permits came to 54 in 2024, against 9 in 2020.
Batteries, additions and system size#
Swipe to see all columns →
| Application year | New installs | With a battery | Added to an existing system | Microinverter permit type | Median system size, modules | Median job valuation |
|---|---|---|---|---|---|---|
| 2020 | 638 | 4% | 3% | 49% | 17397 of 621 state one | $14,300621 of 621 state it |
| 2021 | 462 | 18% | 3% | 46% | 17349 of 447 state one | $16,000445 of 447 state it |
| 2022 | 291 | 34% | 6% | 33% | 21273 of 274 state one | $23,000270 of 274 state it |
| 2023 | 291 | 34% | 12% | 33% | 20254 of 255 state one | $22,000252 of 255 state it |
| 2024 | 228 | 38% | 14% | 34% | 16194 of 197 state one | $15,000177 of 197 state it |
| 2025 | 212 | 39% | 16% | 37% | 13175 of 178 state one | $12,000143 of 178 state it |
| 2026, to May 15 | 93 | 31% | 14% | 47% | 879 of 80 state one | $11,00059 of 80 state it |
New installs by application year. With a battery — the description names an energy storage system (ESS), a battery, a Powerwall or battery storage; this includes 37 permits over the period that add a battery to an existing system without new modules. Added to an existing system — the description ties into existing solar, adds a second system or additional modules. Microinverter permit type — filed under the city's "with Micro-Inverters" types of work. Median system size — modules, or microinverters where the description names no modules, of new systems (not additions); permits naming both give the same count in 96% of cases; under it, how many state one. Median job valuation — the applicant's estimated value of the permitted work, for new systems; under it, how many state one. Source: City of Anaheim Building Permit Report.
The share of new installs with a battery rose from 4% in 2020 to 34% in 2022 and 39% in 2025. Additions to an existing system went from 3% of new installs in 2020 to 16% in 2025. The median new system grew from 17 modules in 2020 to 21 in 2022 and was smaller every year after, 13 in 2025, and the median estimated job value went from $14,300 in 2020 to $23,000 in 2022 and $12,000 in 2025.
Data limits#
The page uses a copy of the city's permit report made on May 17, 2026; the latest application in it is from May 15, 2026, so 2026 is a partial year, and the status of recent permits is as of that copy. The city's records from 2016 to 2021 often have no issue or final date, so every count here is by the date the application was received.
A battery, an addition, a system size or a removal counts only when the permit description names it; more new systems of 2020 and 2021 name neither modules nor microinverters, so the size for those years rests on fewer permits (see the table). Battery-only permits filed under other types of work are not counted, and neither are the 94 commercial and 39 multi-family photovoltaic permit applications of the same period. The job valuation is the applicant's estimate, not a price.
How many home solar permit applications does Anaheim receive a year?
In 2025 the City of Anaheim received 212 applications for new solar installs on existing single-family homes that were not voided or withdrawn, against 638 in 2020, by the city's building permit report.
How many new solar installs in Anaheim include a battery?
39% of new home solar applications in 2025 named a battery or energy storage system in the permit description, against 4% in 2020.
Why is Anaheim not in California's DG Stats solar data?
DG Stats covers interconnections of PG&E, SCE and SDG&E customers, and Anaheim Public Utilities, the city's own electric utility, is not one of them. For Anaheim, the city's building permits are the public source.
Methodology#
Permits are the records of the City of Anaheim Building Permit Report with type of work "Photovoltaic System", "Photovoltaic with Micro-Inverters" or "Phototvoltaic with Micro-Inverters" and the commercial/residential field "Residential - Single Family", copied on May 17, 2026, counted by the date the application was received in the layer (dates are stored at midnight UTC and read as such). A permit counts as an application unless its status is Void, Withdrawn or NSF. Removal or reinstall: the description names reinstalling, removing and reinstalling or installing, removing and discontinuing, removal of, R&R, detaching and reinstalling, or relocating existing solar. On a new home: new construction, a tract, a new ADU, SFD, SFR, dwelling or home, or solar for an ADU. A battery: ESS or E.S.S., battery or batteries, Powerwall, Encharge, SunVault, energy or battery storage, or a storage system. An addition: tying into existing solar, a second system, additional modules, an expansion, or a reference to existing solar. The system size is the first count of modules or panels in the description or, where none is named, the count of microinverters; solar roof tiles have no size here.
Sources#
- City of Anaheim, Planning and Building — Building Permit Report, copied May 17, 2026. https://gis.anaheim.net/planning/issuedpermits/
- City of Anaheim — Building Permit Report user guide: fields Application Received, Job Valuation ("Estimated value of the permitted work"), Type of Work. https://gis.anaheim.net/planning/issuedpermits/user-guide.html
- City of Anaheim — About Electric Services. https://www.anaheim.net/2104/About-Electric-Services
- California Distributed Generation Statistics — Interconnected Project Sites Data Key (Nov 4, 2026), utility field: PG&E, SCE or SDG&E. https://www.californiadgstats.ca.gov/downloads/
How to cite this page#
Cali-Graf. “Home solar and battery permits in Anaheim, 2020–2026.” cali-graf.com, updated Nov 13, 2026. https://cali-graf.com/guides/solar-and-battery-permits-anaheim/