Non-bypassable charges explained with real bill math
Non-bypassable charges are the part of the price of each kWh that a solar home pays even when its solar covers its use, because they are charged on the power taken from the grid, not on the net. At SCE they are four components of the price of each kWh, three in the delivery price and the competition transition charge in the generation price: the public purpose programs charge ($0.00556 per kWh from October 1, 2026), the nuclear decommissioning charge ($0.00003), the competition transition charge ($0.00014) and the wildfire fund charge ($0.00591), $0.01164 in all. Neither NEM 2.0 credits nor Net Billing energy export credits can pay them.
They are small now, but they have not always been: in 2025 they reached $0.04113 per kWh, until most of the public purpose programs charge moved into the Base Services Charge on November 15, 2025.
In this guide
How they are charged#
- NEM 2.0. On the kWh taken from the grid net of the kWh sent to it within each metered interval — an hour or 15 minutes. SCE's own example: a home that takes 5 kWh and sends 3 kWh in the same interval pays them on 2 kWh. Solar sent to the grid at noon does not reduce the charges on power taken at 8 p.m. - Net Billing Tariff. On every kWh taken from the grid; nothing is netted. - What can pay them. NEM 2.0 energy credits and Net Billing energy export credits pay only energy charges. The Net Billing ACC Plus adder can pay the non-bypassable charges. - CARE and Medical Baseline. These customers do not pay the wildfire fund charge.
A month of bill math#
A modeled home that uses 9,000 kWh a year, with solar sized to its use, in July: it took 755 kWh from the grid, hour by hour, and sent 445 kWh to it, a net of 310 kWh. The non-bypassable charges are on the 755 kWh, not the 310: $8.79 for the month at $0.01164 per kWh, on NEM 2.0 and on the Net Billing Tariff alike, since without a battery the hourly import is the same. Over a year the home takes 5,932 kWh from the grid and pays $69; at the 2025 level the same kWh would have cost $244.
On an SCE bill they appear as a line "CTC, NDC, PPPC" and a separate "Wildfire fund charge" line, each on the kWh taken from the grid; on bills without that line, the public purpose programs and nuclear decommissioning charges are inside the delivery price and the competition transition charge inside the generation price, while the wildfire fund charge keeps its own line.
The charges since 2024#
Swipe to see all columns →
| Rates from | PPPC | NDC + CTC | Wildfire fund | Total per kWh |
|---|---|---|---|---|
| Jan 1, 2024Advice 5178-E | $0.02154 | −$0.00030 | $0.00561 | $0.02685 |
| Mar 1, 2024Advice 5235-E | $0.02170 | −$0.00030 | $0.00561 | $0.02701 |
| Jun 1, 2024Advice 5307-E | $0.02145 | −$0.00030 | $0.00561 | $0.02676 |
| Oct 1, 2024Advice 5379-E | $0.02120 | −$0.00030 | $0.00561 | $0.02651 |
| Jan 1, 2025Advice 5449-E | $0.03577 | −$0.00059 | $0.00595 | $0.04113 |
| Mar 1, 2025Advice 5484-E | $0.03546 | −$0.00059 | $0.00595 | $0.04082 |
| Jun 1, 2025Advice 5555-E | $0.03395 | −$0.00059 | $0.00595 | $0.03931 |
| Oct 1, 2025Advice 5643-E | $0.03565 | −$0.00059 | $0.00595 | $0.04101 |
| Nov 15, 2025Advice 5654-E | $0.01060 | −$0.00059 | $0.00595 | $0.01596 |
| Jan 1, 2026Advice 5725-E | $0.00527 | $0.00017 | $0.00591 | $0.01135 |
| Jun 1, 2026Advice 5829-E | $0.00171 | $0.00017 | $0.00591 | $0.00779 |
| Oct 1, 2026Advice 5897-E | $0.00556 | $0.00017 | $0.00591 | $0.01164 |
Non-bypassable charges per kWh at each SCE rate change, from SCE's Schedule TOU-D (the same on all three options); under the date, SCE's advice letter. The NDC and CTC are shown together; negative values reduce the total. The rows are for customers not on CARE: before November 15, 2025, CARE customers paid a public purpose programs charge lower by the CARE surcharge, and CARE and Medical Baseline customers pay no wildfire fund charge. Source: SCE Schedule TOU-D by advice letter, as kept in the Cali-Graf tariff reference and checked against SCE bills.
The jump in January 2025 and the drop on November 15, 2025 are both in the public purpose programs charge; on November 15, 2025 the Base Services Charge took most of it out of the price of each kWh.
What are non-bypassable charges on an SCE solar bill?
Four parts of the price of each kWh — public purpose programs, nuclear decommissioning, competition transition and wildfire fund charges — that a NEM 2.0 or Net Billing home pays on the power it takes from the grid, $0.01164 per kWh from October 1, 2026.
Can solar credits pay non-bypassable charges?
No: NEM 2.0 credits and Net Billing energy export credits pay only energy charges. The Net Billing ACC Plus adder can.
Are non-bypassable charges netted against solar exports?
Under NEM 2.0, only within each metered interval of an hour or 15 minutes; under the Net Billing Tariff, not at all.
Methodology#
The rules are SCE's Schedule NEM-ST (Rates 2, sheet 74879-E; Special Condition 4.c, sheet 87552-E) and Schedule NBT (Rates 2 and 3; Special Condition 4.c); their sentences were checked word for word. The charge levels are the component columns of SCE's Schedule TOU-D at each rate change from January 1, 2024 to October 1, 2026, as kept in Cali-Graf's tariff reference and checked against the "CTC, NDC, PPPC" line on five SCE bills. The month and the year are from the Cali-Graf engine: the middle one, by yearly import, of 30 modeled homes of the inland valleys (NLR ResStock profiles scaled to 9,000 kWh) with south-facing solar sized to the home's use, hour by hour, in 2027. Amounts are rounded half up.
Sources#
- Southern California Edison — Schedule NEM-ST, Rates 2 (Nonbypassable Charges) and Special Condition 4 (Billing). https://www.sce.com/regulatory/regulatory-information/tariff-books/rates-pricing-choices
- Southern California Edison — Schedule NBT, Rates and Special Condition 4. https://www.sce.com/regulatory/regulatory-information/tariff-books/rates-pricing-choices
- Southern California Edison — Schedule TOU-D, as revised by Advice 5178-E (Jan 1, 2024) through Advice 5897-E (Oct 1, 2026). https://www.sce.com/regulatory/regulatory-information/tariff-books/historical-rates
- NLR — ResStock 2025 Release 1. https://registry.opendata.aws/nrel-pds-building-stock/
How to cite this page#
Cali-Graf. “Non-bypassable charges explained with real bill math.” cali-graf.com, updated Nov 17, 2026. https://cali-graf.com/guides/non-bypassable-charges-solar-bill-math/