Cali-Graf · Published Nov 17, 2026 · Data as of Aug 31, 2026

A home with NEM 1.0 or NEM 2.0 solar keeps its net metering for 20 years from the date SCE gave the system permission to operate, to the end of the yearly billing cycle that ends on or after the 20th anniversary; then it moves to the Net Billing Tariff. Selling the house, repairing the system and adding a battery do not end the term. Moving the system, opting into net billing, or adding a battery with a Self-Generation Incentive Program reservation accepted on or after June 4, 2024 does. Growing the system by more than 10% of its original capacity or 1 kW, whichever is greater, ends it unless the addition is kept apart: connected as non-export with NEM 2.0, metered separately with NEM 1.0.

In SCE's Los Angeles County territory, 56,558 homes were connected under NEM 1.0 and 101,704 under NEM 2.0. Few have reached the end so far: 810 NEM 1.0 systems got permission to operate through 2006. The wave comes in 2035 and 2036, when the 26,403 systems connected in 2015 and 2016, 47% of all NEM 1.0 homes, reach 20 years.

101,704
Homes connected under NEM 2.0 in SCE's Los Angeles County territory
DG Stats, through Aug 31, 2026
56,558
Homes connected under NEM 1.0 in SCE's Los Angeles County territory
DG Stats, through Aug 31, 2026
26,403
NEM 1.0 homes whose 20 years end in 2035–2036
Connected in 2015–2016
In this guide
When the 20 years endWhat keeps the 20-year termWhat ends itQuestionsMethodologySourcesHow to cite this page

When the 20 years end#

TariffPermission to operateHomes20 years end
NEM 1.01999–20068102019–2026
NEM 1.02007–20103,3502027–2030
NEM 1.02011–201312,4412031–2033
NEM 1.020147,5302034
NEM 1.0201512,6342035
NEM 1.0201613,7692036
NEM 1.02017–20246,0242037–2044
NEM 2.02017–201922,8012037–2039
NEM 2.02020–202123,1972040–2041
NEM 2.0202222,0162042
NEM 2.0202326,1272043
NEM 2.02024–20267,5632044–2046

Residential solar systems in SCE's Los Angeles County territory on net energy metering, by year of permission to operate (PTO). The term ends at the close of the yearly billing cycle (Relevant Period) that ends on or after the 20th anniversary of PTO, so in the year shown or the next. NEM 1.0 systems connected after 2017 had applied before July 1, 2017; NEM 2.0 systems connected from 2024 had applied before April 15, 2023. Source: California DG Stats, Interconnected Project Sites, data through Aug 31, 2026; SCE Schedules NEM and NEM-ST.

Download this table (CSV)

Quote the add-on without losing NEM
Cali-Graf models a battery or an expansion on an existing NEM system and builds the customer proposal.
Open Cali-Graf

What keeps the 20-year term#

- Selling the house. The term stays with the system, not the owner: it is not lost when the system goes to a new owner, operator or SCE account, as long as it stays at its original location. - Repairs and small changes. Repairing or modifying the system keeps the term if the system grows by no more than 10% of its original nameplate capacity or 1 kW, whichever is greater, and does not exceed the home's yearly use. - Adding a battery on its own. A battery added to an existing system shares the system's term. - Rebuilding after a declared disaster (NEM 1.0 and NEM 2.0). A home whose system was destroyed in a declared state of emergency keeps its original PTO date if the replacement is sized to no more than twelve months of use and is connected within four years by the same customer.

What ends it#

- The 20th year. At the end of the billing cycle after the 20th anniversary, SCE moves the home to the Net Billing Tariff. - Growing the system beyond the limit, unless the addition is kept apart. With NEM 2.0 the addition can be connected under a separate non-export agreement and the original system keeps its term; otherwise the whole system moves to another tariff. With NEM 1.0 the addition can be metered separately under the successor tariff and the original system keeps its term; otherwise the whole system moves. - Moving the system to another address: that is a new installation under the tariffs of the day. - Opting into net billing. A NEM 1.0 home that elects the successor tariff gives up the rest of its term for good. - A battery with an SGIP reservation accepted on or after June 4, 2024, except in the Residential Solar and Storage Equity, low-income Equity Resiliency and San Joaquin Valley budgets: the home moves to the Net Billing Tariff.

How long does NEM 2.0 last?

20 years from the system's permission to operate, to the end of the yearly billing cycle that ends on or after the 20th anniversary; a system that got permission to operate in April 2018, for example, keeps NEM 2.0 through the cycle ending on or after March 31, 2038.

Does NEM 2.0 transfer to a new owner when the house is sold?

Yes. The term belongs to the system at its location, so the buyer keeps the remaining years.

Can I add panels or a battery without losing NEM 2.0?

A battery, yes, unless it comes with an SGIP reservation accepted on or after June 4, 2024 outside the equity budgets. Panels, only up to 10% more capacity or 1 kW, whichever is greater; beyond that the addition has to be connected separately as non-export or the system moves to the Net Billing Tariff.

Methodology#

The rules are those of SCE's tariff sheets: Schedule NEM, Special Conditions 11 and 12 (sheets 85443-E, 89083-E and 89084-E; closed to new customers July 1, 2017, sheet 64409-E), Schedule NEM-ST, Special Conditions 8 to 10 (sheets 87567-E, 89085-E, 87569-E and 87570-E), and the Applicability of Schedule NBT (sheet 87677-E); 10 of their sentences were checked word for word. The counts are residential solar records of SCE in Los Angeles County in California DG Stats with a NEM 1.0 or NEM 2.0 tariff, by year of the approval date, which DG Stats gives as the date of permission to operate. NEM 2.0 applicants had three years from April 14, 2023 to connect, which is why NEM 2.0 systems still appear in 2025 and 2026 (2,229). Rounded half up.

Sources#

  1. Southern California Edison — Schedule NEM, Net Energy Metering, Special Condition 11, NEM Transition Provisions. https://www.sce.com/regulatory/regulatory-information/tariff-books/rates-pricing-choices
  2. Southern California Edison — Schedule NEM-ST, Net Energy Metering Successor Tariff, Special Conditions 8 (Legacy Provisions), 9 (Natural Disaster) and 10 (Sunset Date). https://www.sce.com/regulatory/regulatory-information/tariff-books/rates-pricing-choices
  3. Southern California Edison — Schedule NBT, Net Billing Tariff, Applicability. https://www.sce.com/regulatory/regulatory-information/tariff-books/rates-pricing-choices
  4. California Public Utilities Commission — Decision 14-03-041 (20-year transition for NEM 1.0), Decision 16-01-044 (NEM 2.0), Decision 22-12-056 (Net Billing Tariff), Decision 24-03-071 (SGIP and legacy NEM). https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/customer-generation/net-energy-metering-and-net-billing
  5. California Distributed Generation Statistics — Interconnected Project Sites data set, data through Aug 31, 2026. https://www.californiadgstats.ca.gov/downloads/

How to cite this page#

Cali-Graf. “Legacy NEM 1.0 and 2.0: the 20-year term and what keeps or breaks it.” cali-graf.com, updated Nov 17, 2026. https://cali-graf.com/guides/legacy-nem-20-year-term-sce/