EV charger permits and home solar in Los Angeles County, 2020–2026
In unincorporated Los Angeles County, 465 permits for an EV charger at a single-family home were applied for in 2025, against 150 in 2021, while new solar installs on existing homes fell from 5,320 in 2022 to 2,563 in 2025. For every 100 solar installs there were 4.4 EV charger permits in 2021 and 18.1 in 2025.
Of 8,308 new solar installs on existing homes in unincorporated Los Angeles County, Glendale, Alhambra and El Monte with an application from January 2024 to March 2026, 2.4% came with an EV charger. Of the 1,168 EV charger permits at single-family homes in 2024–2025, 50% came with a main panel upgrade.
An EV charger shows in the permit records as an electrical permit whose description names the charger, an EV outlet or its circuit ("Install Level 2 EV charger in garage", "NEMA 14-50 outlet"), or, in Glendale, as a permit of the city's EV charging station types. This page counts those at parcels that the 2026 assessor roll lists as single-family residences.
In this guide
EV chargers and solar by year in unincorporated Los Angeles County#
Swipe to see all columns →
| Application year | EV charger permits, single-family homes | New solar installs on existing homes | EV chargers per 100 solar installs |
|---|---|---|---|
| 2020 | 94 | 2,149 | 4.4 |
| 2021 | 150 | 3,410 | 4.4 |
| 2022 | 261 | 5,320 | 4.9 |
| 2023 | 378 | 4,508 | 8.4 |
| 2024 | 306 | 3,401 | 9.0 |
| 2025 | 465 | 2,563 | 18.1 |
EV charger permits — issued electrical permits at a single-family parcel whose description names an EV charger or its circuit, by application year. New solar installs — residential solar permits on existing homes, issued by Aug 31, 2026, not voided, canceled or withdrawn and not a removal and reinstallation. The county's solar permit records reach their full volume in July 2019, so the table starts in 2020. Source: LA County Public Works EPIC-LA; LA County Assessor Parcel Data Roll 2026.
EV charger permits were highest in 2025 and new solar installs in 2022; in 2025 the county had fewer than half as many solar installs as in 2022. EV charger permits per 100 solar installs stayed between 4.4 and 4.9 in 2020–2022, then reached 8.4 in 2023, 9.0 in 2024 and 18.1 in 2025. The permits do not say why.
Solar installs with an EV charger#
Swipe to see all columns →
| Jurisdiction | Solar installs | With an EV charger | On the solar permit | Separate EV permit | Same homes 2–3 years earlier |
|---|---|---|---|---|---|
| Unincorporated LA County | 6,348 | 2.1%136 | 0.4% | 1.8% | 0.2% |
| Glendale | 1,397 | 3.3%46 | 0.2% | 3.1% | 0.4% |
| Alhambra | 277 | 2.2%6 | 0.4% | 1.8% | 0.0% |
| El Monte | 286 | 2.8%8 | 1.0% | 1.7% | — |
| All four | 8,308 | 2.4%196 | 0.4% | 2.0% | 0.2% |
New residential solar installs on existing homes with a solar application from Jan 1, 2024 to Mar 31, 2026 and a permit issued by Aug 31, 2026. With an EV charger — named on the solar permit, or a separate EV charger permit at the same home (parcel or street address) applied for from 180 days before to 90 days after the solar application; under the share, the number of installs. Same homes 2–3 years earlier — the same check for separate permits, in a window of the same length ending two years before the solar application, where the jurisdiction's electrical records cover every month of it (El Monte's do not). In Glendale, 68% of the solar permits carry the express permit's standard text, which does not describe the work, so a charger there shows mostly as a separate permit. Source: LA County Public Works EPIC-LA; EnerGov permit portals of Glendale, Alhambra and El Monte; LA County Assessor Parcel Data Roll 2026.
Separate EV charger permits at the same homes two to three years before the solar application came to 0.2% across the four jurisdictions, against 2.0% in the window around it, so EV charger permits cluster around the solar application. The solar permit itself named a charger in 0.4% of installs. Glendale had the highest share with a charger, 3.3%; in the other three jurisdictions it was between 2.1% and 2.8%.
New EV chargers: solar on the home and panel upgrades#
Swipe to see all columns →
| Jurisdiction | EV charger permits, 2024–2025 | Home already had solar | With a panel upgrade |
|---|---|---|---|
| Unincorporated LA County | 771 | 23%178 | 52%399 |
| Glendale | 238 | 20%48 | 22%53 |
| Alhambra | 70 | 10%7 | 81%57 |
| El Monte | 89 | —records start mid-2023 | 82%73 |
| All four | 1,168 | 22%233 of 1,079 | 50%582 |
EV charger permits at single-family parcels applied for in 2024–2025. Home already had solar — a residential solar permit at the same home applied for from Jan 1, 2021 up to the EV charger application, issued and not voided, canceled or withdrawn; El Monte's solar permit records start in mid-2023, so El Monte is left out of this column and of its four-jurisdiction share. With a panel upgrade — the EV charger permit names a main panel or service upgrade, or a separate electrical permit for one is on file at the same home from 180 days before to 90 days after; under each share, the number of permits. In Glendale, 45% of EV charger permits are express permits whose description is a one-line standard text, so an upgrade there shows mostly as a separate permit. Source: LA County Public Works EPIC-LA; EnerGov permit portals of Glendale, Alhambra and El Monte; LA County Assessor Parcel Data Roll 2026.
About half of the new EV chargers came with a panel upgrade: 50% across the four jurisdictions and 52% in unincorporated Los Angeles County. In Alhambra and El Monte the charger and the upgrade are usually written into one permit ("Upgrade panel from 100 amps to 200 amp with EV outlet of 240V"): the EV charger permit itself named an upgrade in 76% and 74% of cases. 22% of the EV charger permits in the county, Glendale and Alhambra were at homes with a solar permit filed since 2021.
Data limits#
An EV charger counts only when a permit names it. Charging from an existing outlet, with no new circuit, and a charger installed without a permit do not show in the records, so the counts are of permitted chargers. A NEMA 14-50 outlet, the common plug for a home charger, counts as a charger unless the permit names an oven, range, dryer, induction cooktop or the kitchen; a charger on a permit written in other words, such as a 240-volt outlet in the garage, is not counted, while an outlet or circuit for a future charger, or one marked for an EV or RV, is. A home whose solar was permitted before 2021 counts as a home without solar in the last table, so the true share of chargers at homes with solar is higher. The wording rules for a charger and a panel upgrade were checked against samples of permit descriptions read by hand.
Single-family means the parcel's use type on the 2026 assessor roll. Unincorporated Los Angeles County covers the areas outside incorporated cities; each city issues its own permits. Solar installs on new homes, including homes in new subdivisions and accessory dwelling units, are left out; EV charger permits count at any single-family parcel, new homes included. La Cañada Flintridge is not included: its portal gives no description for solar or electrical permits.
How many EV charger permits are filed for homes in Los Angeles County?
In unincorporated Los Angeles County, 465 permits for an EV charger at a single-family home were applied for in 2025, up from 150 in 2021: 18.1 for every 100 new solar installs on existing homes, against 4.4 in 2021.
Do homeowners add an EV charger when they install solar?
In the permit records, 2.4% of new solar installs on existing homes in unincorporated Los Angeles County, Glendale, Alhambra and El Monte from January 2024 to March 2026 came with an EV charger, named on the solar permit or filed as a separate permit close to it, against 0.2% with a separate charger permit at the same homes two to three years earlier.
How often does a home EV charger come with a main panel upgrade?
50% of EV charger permits at single-family homes in unincorporated Los Angeles County, Glendale, Alhambra and El Monte in 2024–2025 named a main panel or service upgrade or had a separate upgrade permit close to them; in unincorporated Los Angeles County it was 52%.
Methodology#
EV charger permits are issued electrical permits that were not voided, canceled, withdrawn, denied or refunded: in the county, EPIC-LA cases with case name "Unincorporated Electrical", or "Unincorporated Express" with work class "Express Electrical Residential", that do not say to apply with a city; in Glendale, Alhambra and El Monte, the residential electrical permit types of the panel upgrade page plus Glendale's "Electrical (Single Family Residential) - Electrical Vehicle Charging Station" and "Express Electrical Permit - Electrical Vehicle (EV) Charging Station (Single Family Dwelling only)", which count as EV charger permits by type. Any other permit counts when its description names an EV, EVSE or electric vehicle supply equipment, an electric vehicle, car or electric charger, a Level 2 (L2) or hardwired charger, a wall connector or a charger model, a charging station, an EV outlet, the utility's Charge Ready program, or a NEMA 14-50 or 14-50R outlet (not when an oven, range, dryer, induction cooktop or the kitchen is named), unless a negation such as "no" or "without" comes within three words before it. A permit counts when its parcel is a single-family residence (use type SFR) on the Los Angeles County Assessor's 2026 roll. Each county case number counts once, with every parcel and address of its rows.
Solar installs are those of the panel upgrade page: residential solar permits on existing homes, issued by Aug 31, 2026, not voided, canceled, withdrawn, denied or refunded, not a removal and reinstallation, and not on a new home (a new building on the parcel in the three years before, "#Lot" in the county address, or a subdivision lot, accessory dwelling unit or new construction in the description). A separate permit is matched by parcel number or by house number and street. The earlier-years check uses a window of the same length ending two years before the solar application. A panel upgrade follows the rule of the panel upgrade page: a description naming an MPU or an upgrade, replacement or change-out of the main panel, service panel, MSP, service or meter, or a new main panel with its ampere rating, without a negation; a subpanel does not count. Glendale's "New/Upgrade Service" and El Monte's "Residential Electrical Panel" permits count as upgrades by type unless they are for an accessory dwelling unit, a new building or temporary power. Dates are application dates in Los Angeles time.
Sources#
- Los Angeles County Public Works — EPIC-LA Case History layer, downloaded Sep 2, 2026. https://services.arcgis.com/RmCCgQtiZLDCtblq/arcgis/rest/services/EPIC-LA_Case_History_view/FeatureServer/0
- City of Glendale — EnerGov permit portal. https://glendaleca-energovweb.tylerhost.net/apps/selfservice
- City of Alhambra — EnerGov permit portal. https://alhambraca-energovpub.tylerhost.net/apps/selfservice
- City of El Monte — EnerGov permit portal. https://elmonteca-energovweb.tylerhost.net/apps/selfservice
- Los Angeles County Assessor — Assessor Parcel Data Roll 2026, downloaded Oct 15, 2026. https://services.arcgis.com/RmCCgQtiZLDCtblq/arcgis/rest/services/Assessor%20Parcel%20Data%20Roll%202026/FeatureServer/0
How to cite this page#
Cali-Graf. “EV charger permits and home solar in Los Angeles County, 2020–2026.” cali-graf.com, updated Nov 16, 2026. https://cali-graf.com/guides/ev-chargers-and-solar-los-angeles-county/