Front glass3.2mm, High Transmission, AR Coated Tempered Glass
Back coverBlack backsheet
Junction boxIP 68,3 diodes
Cable / connector4 mm² ,350 mm (With Connectors) · MC4-compatible
Heat & cold behaviour
ZNShine Solar datasheets · CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
Datasheet
CEC listing test
Pmax coefficient γ
−0.35 %/°C
−0.402 %/°C
Voc coefficient β
−0.29 %/°C
−0.297 %/°C
Isc coefficient α
+0.05 %/°C
+0.054 %/°C
Vmp coefficient
≈ −0.40 %/°C
—
Operating cell temperature
NMOT 44 ± 2 °C
NOCT 45.4 °C
Vmp coefficient ≈ γ − α (datasheet); used only for the hot-roof voltage estimate.
At normal operating conditions (NMOT, 800 W/m²) — datasheet
Class
Pmax, W
Voc, V
Isc, A
Vmp, V
Imp, A
390 W
291.5
34.30
10.95
28.30
10.29
395 W
295.2
34.50
11.01
28.50
10.35
400 W
299.0
34.70
11.06
28.70
10.41
405 W
302.7
34.80
11.12
28.90
10.47
410 W
306.3
35.00
11.18
29.10
10.53
Away from lab conditions — CEC listing test points
Class
Pmax at NOCT
Vmp × Imp at NOCT
Pmax at 200 W/m²
Low-light efficiency vs STC
390 W
288.6 W
28.2 V × 10.24 A
79.2 W
102%
395 W
292.3 W
28.38 V × 10.3 A
80.2 W
102%
400 W
296.1 W
28.56 V × 10.37 A
81.3 W
102%
405 W
299.8 W
28.75 V × 10.43 A
82.3 W
102%
410 W
303.4 W
28.93 V × 10.49 A
83.3 W
102%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).
Electrical & strength ratings
Max system voltage1,500 V
Max series fuse25 A
Module temperature−40 °F to +185 °F−40 °C to +85 °C
Certifications
CEC PV Module List (Oct 7, 2026) · ZNShine Solar datasheet
UL 61730IEC 61215IEC 61730IEC 61701IEC 62716ISO 14001ISO 45001ISO 9001
UL 61730CEC listing
IEC 61215datasheet
IEC 61730datasheet
IEC 61701datasheet
IEC 62716datasheet
ISO 14001factory, datasheet
ISO 45001factory, datasheet
ISO 9001factory, datasheet
Warranty & degradation
ZNShine Solar datasheet
Product warranty12 years
Performance warranty25 years
Independent reliability testing
Kiwa PVEL Scorecard
8
PVEL Scorecards
ZNShine Solar named Top Performer, 2016–2026
This exact series is not listed in published PVEL Top Performer tables. Results below are for the manufacturer.
Inverter compatibility & string sizing
ZNShine Solar datasheet · Cali-Graf calculation · NLR PVWatts v8 · CEC PV Module List (Oct 7, 2026) · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
39.8 V
Voc when cold
per panel
25 V
Vmp when hot
per panel
15
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above.
String inverters most named in SoCal permits
Inverter
Max DC input
MPPT
Window source
Panels per string
Tesla 1538000-xx-y
600 V
60–480 V
datasheet
3–15
Solis (Ginlong) S6-EH1P10K-H-US
600 V
80–520 V
datasheet
4–15
Solis (Ginlong) Solis-1P7.6K-4G-US
600 V
100–500 V
datasheet
4–15
Qcells Q.VOLT H7.6SX
498 V
234–498 V
CEC test window
10–12
Microinverters (one per panel)
Microinverter
Recommended module power
Max DC input
MPPT
Voc cold / Vmp hot
Check
DC/AC
Enphase IQ8PLUS-72-2-US
235–440 W
60 V
29–45 V
39.8 / 25 V
⚠ Works; below MPPT at peak heat
1.4
Enphase IQ8X-80-M-US
320–540 W
79.5 V
43–60 V
39.8 / 25 V
✗ Not a match: module voltage below MPPT range
1.07
APsystems (Alt Power System) DS3-L
265–570 W
60 V
28–45 V
39.8 / 25 V
⚠ Works; below MPPT at peak heat
0.52
Enphase IQ8M-72-2-US
260–460 W
60 V
30–45 V
39.8 / 25 V
⚠ Works; below MPPT at peak heat
1.25
Enphase IQ8A-72-2-US
295–500 W
60 V
32–45 V
39.8 / 25 V
✗ Not a match: module voltage below MPPT range
1.16
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.
Expected production in Southern California
NLR PVWatts v8 · Cali-Graf calculation
City
kWh / kW / yr
kWh / panel / yr
kWh / system / yr
Sun, kWh/m²/day
Los Angeles
1,676
679
11,539
6.08
Palmdale
1,835
743
12,634
6.69
Chula Vista
1,696
687
11,677
6.11
Huntington Beach
1,643
665
11,312
5.89
Riverside
1,696
687
11,677
6.21
Santa Clarita
1,724
698
11,870
6.28
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.
Who installs ZXM7-SH108-xxx/M panels in SoCal
building permits · CSLB License Master
9
Permits naming this series
Jan 2023 – Aug 2025
1
Licensed installers
CSLB license on the permit
3
Jurisdictions so far
LA County (unincorp.) (7), Palmdale (1), Los Angeles (1)
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.
Installed together with
building permits
Microinverters
Enphase IQ7+
3
Enphase IQ8+
3
Enphase M250
2
Number of permits naming both this panel series and the product; 7 of 9 permits list other equipment.
Compare with similar 405 W panels
CEC PV Module List (Oct 7, 2026) · Qcells datasheet · Kiwa PVEL Scorecard · building permits
Panel
Pmax
Efficiency
γ Pmax (CEC)
Voc, V
Isc, A
PVEL (product / brand)
SoCal permits (series)
ZNShine Solar ZXM7-SH108-405/M
405 W
≈20.7%
−0.402
37.3
13.77
brand 8×
9
Qcells Q.PEAK DUO BLK ML-G10+ 405
405 W
≥20.6%
−0.362
45.34
11.17
product 2022, 2023
221
JA Solar JAM54S31-405/MR
405 W
≈21.3%
−0.329
37.23
13.87
product 2023, 2024
152
REC Group REC405AA Pure
405 W
≈22.6%
−0.256
48.9
10.3
brand 9× (2016–2025)
66
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.
Questions & answers
How efficient is the ZNShine Solar ZXM7-SH108-405/M?
Calculated from the panel area (1.96 m²): about 20.7% for the 405 W class. 405 W over 1.96 m² equals about 207 W per square meter.
How much energy does one panel produce in Los Angeles or Palmdale?
PVWatts v8 with typical-year weather gives about 679 kWh per year per 405 W panel in Los Angeles and about 743 kWh in Palmdale (20° roof, facing south, 14% system losses).
How much power does it lose on a hot roof?
With γ = −0.35 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 18.1% below the STC rating.
How many panels fit on one string?
With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–15 panels per string (Voc at 2 °C = 39.8 V, Vmp at 74 °C cell = 25 V). Final design must follow the inverter manual and NEC 690.7.
What does the warranty cover?
12 years on the product and 25 years on performance (manufacturer datasheet).
Has this panel been reliability-tested?
This exact series is not in published PVEL Top Performer tables; ZNShine Solar was named a Top Performer in 8 Scorecards (2016–2026).
Who installs it in Southern California?
Building permits name this series 9 times (Jan 2023 – Aug 2025). The most active licensed installers are American Array Solar Electric.
Sources
California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
ZNShine Solar — manufacturer datasheet “ZXM7-SH108 Series 10BB HALF-CELL Black Monocrystalline PERC PV Module”.
ZNShine Solar — manufacturer datasheet “ZXM7-SH108 Series 10BB HALF-CELL Black Monocrystalline PERC PV Module”.
Qcells — manufacturer datasheet “Q.PEAK DUO BLK ML-G10+ ENDURING HIGH PERFORMANCE”.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Apr 2023 – Jun 2025); City of Palmdale (Aug 2025); LADBS, City of Los Angeles (Jan 2023). Equipment matched from permit descriptions by model number.
Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.