Cali-GrafCali-Graf
Solar panelTrina Solar

Trina Solar TSM-390DE09C.07

120 half-cut cells. Power classes 380–405 W in the CEC list.

CEC listed · Jul 1, 2022UL 61730Installed in 6 SoCal permits
Power class
  • Power (STC)390 WCEC nameplate
  • Efficiency≈20.4%calculated from area
  • %/°C Pmax−0.342CEC listing test
  • PTC / STC93.3%PTC 364 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · 6 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
TSM-380DE09C.07380 W40.4012.0033.4011.38≈19.9%354 WJul 1, 2022
TSM-385DE09C.07385 W40.6012.0733.6011.46≈20.2%359 WJul 1, 2022
TSM-390DE09C.07390 W40.8012.1433.8011.54≈20.4%364 WJul 1, 2022
TSM-395DE09C.07395 W41.0012.2134.0011.62≈20.7%368 WJul 1, 2022
TSM-400DE09C.07400 W41.2012.2834.2011.70≈20.9%373 WJul 1, 2022
TSM-405DE09C.07405 W41.4012.3434.4011.77≈21.2%378 WJul 1, 2022
≈ efficiency = Pmax ÷ CEC-listed area 1.91 m².

Build & dimensions

CEC PV Module List (Oct 7, 2026)

Heat & cold behaviour

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
CEC listing test
Pmax coefficient γ−0.342 %/°C
Voc coefficient β−0.256 %/°C
Isc coefficient α+0.032 %/°C
Operating cell temperatureNOCT 45.6 °C
Vmp coefficient ≈ γ − α (CEC); used only for the hot-roof voltage estimate.

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
380 W278.5 W31.78 V × 8.76 A73.9 W97%
385 W282.1 W31.97 V × 8.82 A74.9 W97%
390 W285.8 W32.16 V × 8.89 A75.9 W97%
395 W289.5 W32.35 V × 8.95 A76.8 W97%
400 W293.2 W32.54 V × 9.01 A77.8 W97%
405 W296.7 W32.73 V × 9.06 A78.7 W97%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Independent reliability testing

Kiwa PVEL Scorecard · RETC PV Module Index
12
PVEL Scorecards
Trina Solar named Top Performer, 2014–2026
2023, 2024, 2025, 2026
RETC Overall Highest Achiever
Trina Solar, manufacturer level
This exact series is not listed in published PVEL Top Performer tables. Results below are for the manufacturer.

RETC PV Module Index — Trina Solar

YearRecognition
2023Overall Highest Achiever; High Achievement in Performance (Ptc-to-stc ratio, Module efficiency, LeTID RESISTANCE); High Achievement in Quality (Hail durability test); High Achievement in Reliability (Thermal cycle test, SDML, Pid resistance, Damp heat test)
2024Overall Highest Achiever
2025Overall Highest Achiever
2026Overall Highest Achiever; High achievement in performance; High achievement in reliability; Performance discipline high achiever (Temperature coefficient, Iam, Letid, PAN file); Quality discipline high achiever (BOM verification); Reliability discipline high achiever (Damp heat, Pid, Sdml, Tc)

Inverter compatibility & string sizing

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · NLR PVWatts v8 · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
43.2 V
Voc when cold
per panel
27.6 V
Vmp when hot
per panel
13
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above. β is the CEC-measured coefficient; NEC 690.7 calculations use the datasheet value.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet3–13
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet3–13
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet4–13
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window9–11

Microinverters (one per panel)

MicroinverterRecommended module powerMax DC inputMPPTVoc cold / Vmp hotCheckDC/AC
Enphase IQ8PLUS-72-2-US235–440 W60 V29–45 V43.2 / 27.6 V⚠ Works; below MPPT at peak heat1.34
Enphase IQ8X-80-M-US320–540 W79.5 V43–60 V43.2 / 27.6 V✗ Not a match: module voltage below MPPT range1.03
APsystems (Alt Power System) DS3-L265–570 W60 V28–45 V43.2 / 27.6 V⚠ Works; below MPPT at peak heat0.5
Enphase IQ8M-72-2-US260–460 W60 V30–45 V43.2 / 27.6 V⚠ Works; below MPPT at peak heat1.2
Enphase IQ8A-72-2-US295–500 W60 V32–45 V43.2 / 27.6 V⚠ Works; below MPPT at peak heat1.12
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,67665411,7666.08
Palmdale1,83571612,8826.69
Chula Vista1,69666111,9066.11
Huntington Beach1,64364111,5345.89
Riverside1,69666111,9066.21
Santa Clarita1,72467212,1026.28
768Jan769Feb986Mar1,090Apr1,076May1,144Jun1,205Jul1,219Aug1,066Sep940Oct808Nov699DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Who installs TSM-xxxDE09C.07 panels in SoCal

building permits
6
Permits naming this series
Dec 2024 – Jun 2025
1
Jurisdictions so far
LA County (unincorp.) (6)

Permits over time

1Dec ’240Jan ’251Feb0Mar1Apr1May2Junpermits per month

Power class named in permit

390 W
4
385 W
2
395 W
1

Typical system

median 7.7 kW, 17 panels (n = 6)

Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.

Installed together with

building permits

Microinverters

Enphase IQ8+
4

Batteries

Enphase IQ Battery 5P
5
Number of permits naming both this panel series and the product; 5 of 6 permits list other equipment.

Compare with similar 390 W panels

CEC PV Module List (Oct 7, 2026) · Qcells datasheet · Kiwa PVEL Scorecard · building permits
PanelPmaxEfficiencyγ Pmax (CEC)Voc, VIsc, APVEL (product / brand)SoCal permits (series)
Trina Solar TSM-390DE09C.07390 W≈20.4%−0.34240.812.14brand 12×6
Qcells Q.PEAK DUO BLK ML-G10+ 390390 W≥19.9%−0.36245.2311.07product 2022, 2023221
JA Solar JAM54S31-390/MR390 W≈20.5%−0.32936.8513.61product 2023, 2024152
REC Group REC390AA Pure390 W≈21.8%−0.25648.610.19brand 9× (2016–2025)66
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.

About Trina Solar

CEC PV Module List (Oct 7, 2026) · Kiwa PVEL Scorecard · RETC PV Module Index · building permits

Other series by SoCal permits

TSM-xxxDE06X.05(II) · 23TSM-xxxNE09RC.05 · 6TSM-xxxNEG19RC.20TSM-xxxNEG21C.20TSM-xxxNEG9RH.25TSM-xxxNE09RH.05

Questions & answers

How efficient is the Trina Solar TSM-390DE09C.07?

Calculated from the panel area (1.91 m²): about 20.4% for the 390 W class. 390 W over 1.91 m² equals about 204 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 654 kWh per year per 390 W panel in Los Angeles and about 716 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.342 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 17.7% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–13 panels per string (Voc at 2 °C = 43.2 V, Vmp at 74 °C cell = 27.6 V). Final design must follow the inverter manual and NEC 690.7.

Has this panel been reliability-tested?

This exact series is not in published PVEL Top Performer tables; Trina Solar was named a Top Performer in 12 Scorecards (2014–2026). RETC named Trina Solar Overall Highest Achiever in 2023, 2024, 2025, 2026.

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. Qcells — manufacturer datasheet “Q.PEAK DUO BLK ML-G10+ ENDURING HIGH PERFORMANCE”.
  3. Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists 2014–2026.
  4. RETC — PV Module Index reports 2023–2026.
  5. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  6. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  7. Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
  8. Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Dec 2024 – Jun 2025). Equipment matched from permit descriptions by model number.
  9. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).