Tesla datasheet · Cali-Graf calculation · NLR PVWatts v8 · CEC PV Module List (Oct 7, 2026) · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
43.5 V
Voc when cold
per panel
27.9 V
Vmp when hot
per panel
13
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above.
String inverters most named in SoCal permits
Inverter
Max DC input
MPPT
Window source
Panels per string
Tesla 1538000-xx-y
600 V
60–480 V
datasheet
3–13
Solis (Ginlong) S6-EH1P10K-H-US
600 V
80–520 V
datasheet
3–13
Solis (Ginlong) Solis-1P7.6K-4G-US
600 V
100–500 V
datasheet
4–13
Qcells Q.VOLT H7.6SX
498 V
234–498 V
CEC test window
9–11
Microinverters (one per panel)
Microinverter
Recommended module power
Max DC input
MPPT
Voc cold / Vmp hot
Check
DC/AC
Enphase IQ8PLUS-72-2-US
235–440 W
60 V
29–45 V
43.5 / 27.9 V
⚠ Works; below MPPT at peak heat
1.45
Enphase IQ8X-80-M-US
320–540 W
79.5 V
43–60 V
43.5 / 27.9 V
✗ Not a match: module voltage below MPPT range
1.11
APsystems (Alt Power System) DS3-L
265–570 W
60 V
28–45 V
43.5 / 27.9 V
⚠ Works; below MPPT at peak heat
0.54
Enphase IQ8M-72-2-US
260–460 W
60 V
30–45 V
43.5 / 27.9 V
⚠ Works; below MPPT at peak heat
1.29
Enphase IQ8A-72-2-US
295–500 W
60 V
32–45 V
43.5 / 27.9 V
⚠ Works; below MPPT at peak heat
1.2
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.
Expected production in Southern California
NLR PVWatts v8 · Cali-Graf calculation
City
kWh / kW / yr
kWh / panel / yr
kWh / system / yr
Sun, kWh/m²/day
Los Angeles
1,676
704
11,967
6.08
Palmdale
1,835
771
13,102
6.69
Chula Vista
1,696
712
12,109
6.11
Huntington Beach
1,643
690
11,731
5.89
Riverside
1,696
712
12,109
6.21
Santa Clarita
1,724
724
12,309
6.28
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Counts grow as more permit portals are loaded.
Installed together with
building permits
Batteries
Tesla Powerwall 3
24
Tesla Powerwall 3 Expansion
9
Number of permits naming both this panel series and the product; 24 of 24 permits list other equipment.
Compare with similar 420 W panels
CEC PV Module List (Oct 7, 2026) · datasheets · Kiwa PVEL Scorecard · building permits
Panel
Pmax
Efficiency
γ Pmax (CEC)
Voc, V
Isc, A
Warranty
PVEL (product / brand)
SoCal permits (series)
Tesla TSP 420
420 W
≥20.5%
−0.345
40.95
13.03
25 / 25 yr
—
24
Qcells Q.PEAK DUO BLK ML-G10+ 415
415 W
≈21.1%
−0.337
45.41
11.23
25 / 25 yr
product 2022, 2023
221
LONGi LR5-54HABB-415M
415 W
≈21.8%
−0.342
37.77
13.94
—
brand 9× (2017–2026)
64
Canadian Solar CS3N-420MS
420 W
≥20.7%
−0.332
45.3
11.74
25 yr
product 2023
46
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.
The Tesla datasheet guarantees at least 20.5% module efficiency for the 420 W class. 420 W over 2.05 m² equals about 205 W per square meter.
How much energy does one panel produce in Los Angeles or Palmdale?
PVWatts v8 with typical-year weather gives about 704 kWh per year per 420 W panel in Los Angeles and about 771 kWh in Palmdale (20° roof, facing south, 14% system losses).
How much power does it lose on a hot roof?
With γ = −0.34 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 17.6% below the STC rating.
How many panels fit on one string?
With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–13 panels per string (Voc at 2 °C = 43.5 V, Vmp at 74 °C cell = 27.9 V). Final design must follow the inverter manual and NEC 690.7.
What does the warranty cover?
25 years on the product and 25 years on performance: at least 98% of rated power in year 1, then no more than 0.45% per year — at least 87.2% after 25 years (manufacturer datasheet).
Building permits name this series 24 times (Oct 2025 – Sep 2026). The most active licensed installers are Tesla Energy Operations Inc, Solar Shoppers Construction.
Sources
California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
Qcells — manufacturer datasheet “Q.PEAK DUO BLK ML-G10+ ENDURING HIGH PERFORMANCE”.
Canadian Solar — manufacturer datasheet “HiKu Mono PERC CS3N-400|405|410|415|420|425MS MORE POWER”.
Tesla — document library on the manufacturer’s website (links above).
Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
Building permits — City of Palmdale (Oct 2025 – Sep 2026). Equipment matched from permit descriptions by model number.
Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.