Cali-GrafCali-Graf
Solar panelSunPower

SunPower SPR-MAX3-410-BLK

112 cells. Power classes 395–420 W in the CEC list.

CEC listed · Apr 14, 2023UL 61730
Power class
  • Power (STC)410 WCEC nameplate
  • Efficiency≈21.6%calculated from area
  • %/°C Pmax−0.272CEC listing test
  • PTC / STC94.9%PTC 389 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · 5 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
SPR-MAX3-395-BLK395 W81.226.2969.125.71≈20.8%375 WApr 14, 2023
SPR-MAX3-400-BLK400 W81.266.3069.555.75≈21.1%379 WApr 14, 2023
SPR-MAX3-410-BLK410 W81.406.3170.405.82≈21.6%389 WApr 14, 2023
SPR-MAX3-415-BLK415 W81.406.3270.805.86≈21.8%394 WApr 14, 2023
SPR-MAX3-420-BLK420 W81.506.3271.305.89≈22.1%399 WApr 14, 2023
≈ efficiency = Pmax ÷ CEC-listed area 1.9 m².

Build & dimensions

CEC PV Module List (Oct 7, 2026)

Heat & cold behaviour

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
CEC listing test
Pmax coefficient γ−0.272 %/°C
Voc coefficient β−0.233 %/°C
Isc coefficient α+0.056 %/°C
Operating cell temperatureNOCT 45 °C
Vmp coefficient ≈ γ − α (CEC); used only for the hot-roof voltage estimate.

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
395 W299.2 W64.67 V × 4.63 A74.2 W94%
400 W303.2 W65.07 V × 4.66 A75.2 W94%
410 W310.7 W65.86 V × 4.72 A77.1 W94%
415 W314.6 W66.24 V × 4.75 A78 W94%
420 W318.4 W66.71 V × 4.77 A79 W94%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Inverter compatibility & string sizing

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · NLR PVWatts v8 · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
85.8 V
Voc when cold
per panel
59.1 V
Vmp when hot
per panel
6
Max panels / string
max DC 600 V
2
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above. β is the CEC-measured coefficient; NEC 690.7 calculations use the datasheet value.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet2–6
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet2–6
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet2–6
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window4–5

Microinverters (one per panel)

MicroinverterRecommended module powerMax DC inputMPPTVoc cold / Vmp hotCheckDC/AC
Enphase IQ8PLUS-72-2-US235–440 W60 V29–45 V85.8 / 59.1 V✗ Not allowed: cold Voc above max input1.41
Enphase IQ8X-80-M-US320–540 W79.5 V43–60 V85.8 / 59.1 V✗ Not allowed: cold Voc above max input1.08
APsystems (Alt Power System) DS3-L265–570 W60 V28–45 V85.8 / 59.1 V✗ Not allowed: cold Voc above max input0.53
Enphase IQ8M-72-2-US260–460 W60 V30–45 V85.8 / 59.1 V✗ Not allowed: cold Voc above max input1.26
Enphase IQ8A-72-2-US295–500 W60 V32–45 V85.8 / 59.1 V✗ Not allowed: cold Voc above max input1.17
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,67668711,6826.08
Palmdale1,83575212,7906.69
Chula Vista1,69669511,8216.11
Huntington Beach1,64367411,4525.89
Riverside1,69669511,8216.21
Santa Clarita1,72470712,0166.28
763Jan763Feb979Mar1,082Apr1,069May1,135Jun1,196Jul1,210Aug1,058Sep933Oct802Nov694DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Compare with similar 410 W panels

CEC PV Module List (Oct 7, 2026) · Qcells datasheet · Kiwa PVEL Scorecard · building permits
PanelPmaxEfficiencyγ Pmax (CEC)Voc, VIsc, APVEL (product / brand)SoCal permits (series)
SunPower SPR-MAX3-410-BLK410 W≈21.6%−0.27281.46.31——
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W≈20.9%−0.33745.3711.2product 2022, 2023221
JA Solar JAM54S31-405/MR405 W≈21.3%−0.32937.2313.87product 2023, 2024152
REC Group REC410AA Pure410 W≈22.9%−0.2564910.35brand 9× (2016–2025)66
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.

Questions & answers

How efficient is the SunPower SPR-MAX3-410-BLK?

Calculated from the panel area (1.9 m²): about 21.6% for the 410 W class. 410 W over 1.9 m² equals about 216 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 687 kWh per year per 410 W panel in Los Angeles and about 752 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.272 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 14.1% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 2–6 panels per string (Voc at 2 °C = 85.8 V, Vmp at 74 °C cell = 59.1 V). Final design must follow the inverter manual and NEC 690.7.

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. Qcells — manufacturer datasheet “Q.PEAK DUO BLK ML-G10+ ENDURING HIGH PERFORMANCE”.
  3. Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists.
  4. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  5. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  6. Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
  7. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  8. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).