Cali-GrafCali-Graf
Solar panelNew East Solar Energy (Cambodia)

New East Solar Energy (Cambodia) NESE665-66MHB-G12

132 half-cut cells. Power classes 655–675 W in the CEC list.

CEC listed · Mar 3, 2025UL 61730
Power class
  • Power (STC)665 WCEC nameplate
  • Efficiency≈21.6%calculated from area
  • %/°C Pmax−0.310CEC listing test
  • PTC / STC94.7%PTC 630 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · 5 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
NESE655-66MHB-G12655 W45.4018.3237.9017.29≈21.3%620 WMar 3, 2025
NESE660-66MHB-G12660 W45.6018.3738.1017.33≈21.4%625 WMar 3, 2025
NESE665-66MHB-G12665 W45.8018.4238.3017.37≈21.6%630 WMar 3, 2025
NESE670-66MHB-G12670 W46.0018.4738.5017.41≈21.8%634 WMar 3, 2025
NESE675-66MHB-G12675 W46.2018.5238.7017.45≈21.9%639 WMar 3, 2025
≈ efficiency = Pmax ÷ CEC-listed area 3.08 m².

Build & dimensions

CEC PV Module List (Oct 7, 2026)

Heat & cold behaviour

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
CEC listing test
Pmax coefficient γ−0.310 %/°C
Voc coefficient β−0.238 %/°C
Isc coefficient α+0.043 %/°C
Operating cell temperatureNOCT 43.4 °C
Vmp coefficient ≈ γ − α (CEC); used only for the hot-roof voltage estimate.

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
655 W489.4 W35.73 V × 13.7 A124.4 W95%
660 W493.1 W35.92 V × 13.73 A125.4 W95%
665 W496.9 W36.11 V × 13.76 A126.3 W95%
670 W500.6 W36.29 V × 13.79 A127.3 W95%
675 W504.4 W36.48 V × 13.83 A128.2 W95%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Inverter compatibility & string sizing

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · NLR PVWatts v8 · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
48.3 V
Voc when cold
per panel
31.7 V
Vmp when hot
per panel
12
Max panels / string
max DC 600 V
2
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above. β is the CEC-measured coefficient; NEC 690.7 calculations use the datasheet value.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet2–12
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet3–12
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet4–12
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window8–10

Microinverters (one per panel)

No microinverter in the reference set lists this power class in its recommended module power range.
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,6761,11512,2606.08
Palmdale1,8351,22013,4236.69
Chula Vista1,6961,12812,4066.11
Huntington Beach1,6431,09312,0195.89
Riverside1,6961,12812,4066.21
Santa Clarita1,7241,14612,6116.28
800Jan801Feb1,028Mar1,135Apr1,121May1,192Jun1,255Jul1,270Aug1,110Sep979Oct842Nov729DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Questions & answers

How efficient is the New East Solar Energy (Cambodia) NESE665-66MHB-G12?

Calculated from the panel area (3.08 m²): about 21.6% for the 665 W class. 665 W over 3.08 m² equals about 216 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 1,115 kWh per year per 665 W panel in Los Angeles and about 1,220 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.310 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 16% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 2–12 panels per string (Voc at 2 °C = 48.3 V, Vmp at 74 °C cell = 31.7 V). Final design must follow the inverter manual and NEC 690.7.

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  3. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  4. Inverter datasheets — Solis (Ginlong), Tesla (manufacturer documents).
  5. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).