Cali-GrafCali-Graf
Solar panelNew East Solar Energy (Cambodia)

New East Solar Energy (Cambodia) NESE365-60MH-M6

120 half-cut cells. Power classes 360–375 W in the CEC list.

CEC listed · Nov 1, 2022UL 61730
Power class
  • Power (STC)365 WCEC nameplate
  • Efficiency≈20.3%calculated from area
  • %/°C Pmax−0.321CEC listing test
  • PTC / STC93.9%PTC 343 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · 4 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
NESE360-60MH-M6360 W40.6011.2433.8010.66≈20.0%338 WNov 1, 2022
NESE365-60MH-M6365 W40.8011.3334.0010.74≈20.3%343 WNov 1, 2022
NESE370-60MH-M6370 W41.0011.4234.2010.82≈20.6%348 WNov 1, 2022
NESE375-60MH-M6375 W41.2011.5134.4010.91≈20.8%352 WNov 1, 2022
≈ efficiency = Pmax ÷ CEC-listed area 1.8 m².

Build & dimensions

CEC PV Module List (Oct 7, 2026)

Heat & cold behaviour

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
CEC listing test
Pmax coefficient γ−0.321 %/°C
Voc coefficient β−0.258 %/°C
Isc coefficient α+0.059 %/°C
Operating cell temperatureNOCT 44.7 °C
Vmp coefficient ≈ γ − α (CEC); used only for the hot-roof voltage estimate.

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
360 W271.6 W32.37 V × 8.39 A69.1 W96%
365 W275.3 W32.56 V × 8.46 A70 W96%
370 W279 W32.75 V × 8.52 A71 W96%
375 W283 W32.94 V × 8.59 A72 W96%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Inverter compatibility & string sizing

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · NLR PVWatts v8 · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
43.2 V
Voc when cold
per panel
27.7 V
Vmp when hot
per panel
13
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above. β is the CEC-measured coefficient; NEC 690.7 calculations use the datasheet value.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet3–13
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet3–13
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet4–13
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window9–11

Microinverters (one per panel)

MicroinverterRecommended module powerMax DC inputMPPTVoc cold / Vmp hotCheckDC/AC
Enphase IQ8PLUS-72-2-US235–440 W60 V29–45 V43.2 / 27.7 V⚠ Works; below MPPT at peak heat1.26
Enphase IQ8X-80-M-US320–540 W79.5 V43–60 V43.2 / 27.7 V✗ Not a match: module voltage below MPPT range0.96
APsystems (Alt Power System) DS3-L265–570 W60 V28–45 V43.2 / 27.7 V⚠ Works; below MPPT at peak heat0.47
Enphase IQ8M-72-2-US260–460 W60 V30–45 V43.2 / 27.7 V⚠ Works; below MPPT at peak heat1.12
Enphase IQ8A-72-2-US295–500 W60 V32–45 V43.2 / 27.7 V⚠ Works; below MPPT at peak heat1.05
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,67661211,6236.08
Palmdale1,83567012,7266.69
Chula Vista1,69661911,7626.11
Huntington Beach1,64360011,3945.89
Riverside1,69661911,7626.21
Santa Clarita1,72462911,9566.28
759Jan759Feb974Mar1,076Apr1,063May1,130Jun1,190Jul1,204Aug1,053Sep929Oct798Nov691DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Compare with similar 365 W panels

CEC PV Module List (Oct 7, 2026) · Kiwa PVEL Scorecard · building permits
PanelPmaxEfficiencyγ Pmax (CEC)Voc, VIsc, APVEL (product / brand)SoCal permits (series)
New East Solar Energy (Cambodia) NESE365-60MH-M6365 W≈20.3%−0.32140.811.33——
LONGi LR4-60HPB-365M365 W≈20.6%−0.3394111.41product 2021, 2022193
REC Group REC365AA365 W≈21.7%−0.27944.310.26brand 9× (2016–2025)30
Trina Solar TSM-365DE06X.05(II)365 W≈20.1%−0.3394510.35product 202223
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.

Questions & answers

How efficient is the New East Solar Energy (Cambodia) NESE365-60MH-M6?

Calculated from the panel area (1.8 m²): about 20.3% for the 365 W class. 365 W over 1.8 m² equals about 203 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 612 kWh per year per 365 W panel in Los Angeles and about 670 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.321 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 16.6% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–13 panels per string (Voc at 2 °C = 43.2 V, Vmp at 74 °C cell = 27.7 V). Final design must follow the inverter manual and NEC 690.7.

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists.
  3. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  4. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  5. Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
  6. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  7. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).