Mission Solar Energy named Top Performer, 2024–2025
4
RETC PV Module Index
Mission Solar Energy recognized 2023–2026
This exact series is not listed in published PVEL Top Performer tables. Results below are for the manufacturer.
RETC PV Module Index — Mission Solar Energy
Year
Recognition
2023
High Achievement in Performance (Module efficiency)
2024
Test Category High Achiever
2025
Performance High Achiever
2026
Performance discipline high achiever (Iam, Lid); Quality discipline high achiever (BOM verification); Test Category High Achiever
Inverter compatibility & string sizing
Mission Solar Energy datasheet · Cali-Graf calculation · NLR PVWatts v8 · CEC PV Module List (Oct 7, 2026) · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
42.9 V
Voc when cold
per panel
26.3 V
Vmp when hot
per panel
13
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above.
String inverters most named in SoCal permits
Inverter
Max DC input
MPPT
Window source
Panels per string
Tesla 1538000-xx-y
600 V
60–480 V
datasheet
3–13
Solis (Ginlong) S6-EH1P10K-H-US
600 V
80–520 V
datasheet
4–13
Solis (Ginlong) Solis-1P7.6K-4G-US
600 V
100–500 V
datasheet
4–13
Qcells Q.VOLT H7.6SX
498 V
234–498 V
CEC test window
9–11
Microinverters (one per panel)
Microinverter
Recommended module power
Max DC input
MPPT
Voc cold / Vmp hot
Check
DC/AC
Enphase IQ8PLUS-72-2-US
235–440 W
60 V
29–45 V
42.9 / 26.3 V
⚠ Works; below MPPT at peak heat
1.07
APsystems (Alt Power System) DS3-L
265–570 W
60 V
28–45 V
42.9 / 26.3 V
⚠ Works; below MPPT at peak heat
0.4
Enphase IQ8M-72-2-US
260–460 W
60 V
30–45 V
42.9 / 26.3 V
⚠ Works; below MPPT at peak heat
0.95
Enphase IQ8A-72-2-US
295–500 W
60 V
32–45 V
42.9 / 26.3 V
⚠ Works; below MPPT at peak heat
0.89
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.
Expected production in Southern California
NLR PVWatts v8 · Cali-Graf calculation
City
kWh / kW / yr
kWh / panel / yr
kWh / system / yr
Sun, kWh/m²/day
Los Angeles
1,676
520
11,950
6.08
Palmdale
1,835
569
13,084
6.69
Chula Vista
1,696
526
12,092
6.11
Huntington Beach
1,643
509
11,715
5.89
Riverside
1,696
526
12,092
6.21
Santa Clarita
1,724
534
12,292
6.28
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.
Compare with similar 310 W panels
CEC PV Module List (Oct 7, 2026) · JinkoSolar datasheets · Kiwa PVEL Scorecard · building permits
Panel
Pmax
Efficiency
γ Pmax (CEC)
Voc, V
Isc, A
PVEL (product / brand)
SoCal permits (series)
Mission Solar Energy MSE310TS60
310 W
≥18.5%
−0.403
40.3
9.94
brand 2×
1
JinkoSolar JKM310M-60HBL
310 W
≈18.4%
−0.407
40.5
9.92
brand 12× (2014–2026)
45
REC Group REC310NP
310 W
≈19.1%
−0.351
40.2
10.01
brand 9× (2016–2025)
4
Sinotec USA STS-310M3B-60
310 W
≈18.8%
−0.375
40.3
10.04
—
3
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.
How efficient is the Mission Solar Energy MSE310TS60?
The Mission Solar Energy datasheet guarantees at least 18.5% module efficiency for the 310 W class. 310 W over 1.68 m² equals about 185 W per square meter.
How much energy does one panel produce in Los Angeles or Palmdale?
PVWatts v8 with typical-year weather gives about 520 kWh per year per 310 W panel in Los Angeles and about 569 kWh in Palmdale (20° roof, facing south, 14% system losses).
How much power does it lose on a hot roof?
With γ = −0.38 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 19.7% below the STC rating.
How many panels fit on one string?
With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–13 panels per string (Voc at 2 °C = 42.9 V, Vmp at 74 °C cell = 26.3 V). Final design must follow the inverter manual and NEC 690.7.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
Building permits — LADBS, City of Los Angeles (Jan 2020). Equipment matched from permit descriptions by model number.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.