Cali-GrafCali-Graf
Solar panelLONGi

LONGi LR4-72HIH-435M

144 half-cut cells. Power classes 420–450 W in the CEC list.

CEC listed · Mar 23, 2020UL 61730PVEL Top Performer 2021
Power class
  • Power (STC)435 WCEC nameplate
  • Efficiency≈20.0%calculated from area
  • %/°C Pmax−0.340CEC listing test
  • PTC / STC93.2%PTC 406 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · 7 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
LR4-72HIH-420M420 W48.8011.0440.2010.45≈19.4%391 WMar 23, 2020
LR4-72HIH-425M425 W49.0011.1140.4010.52≈19.6%396 WMar 23, 2020
LR4-72HIH-430M430 W49.2011.1940.6010.60≈19.8%401 WMar 23, 2020
LR4-72HIH-435M435 W49.4011.2640.8010.67≈20.0%406 WMar 23, 2020
LR4-72HIH-440M440 W49.6011.3341.0010.74≈20.3%410 WMar 23, 2020
LR4-72HIH-445M445 W49.8011.4041.2010.80≈20.5%415 WMar 23, 2020
LR4-72HIH-450M450 W50.0011.5041.4010.90≈20.7%420 WMar 23, 2020
≈ efficiency = Pmax ÷ CEC-listed area 2.17 m².

Build & dimensions

CEC PV Module List (Oct 7, 2026)

Heat & cold behaviour

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
CEC listing test
Pmax coefficient γ−0.340 %/°C
Voc coefficient β−0.269 %/°C
Isc coefficient α+0.040 %/°C
Operating cell temperatureNOCT 45.6 °C
Vmp coefficient ≈ γ − α (CEC); used only for the hot-roof voltage estimate.

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
420 W309.7 W37.55 V × 8.25 A78.3 W93%
425 W313.4 W37.73 V × 8.3 A79.2 W93%
430 W317.3 W37.92 V × 8.37 A80.2 W93%
435 W321 W38.11 V × 8.42 A81.2 W93%
440 W324.7 W38.29 V × 8.48 A82.1 W93%
445 W328.1 W38.48 V × 8.53 A83 W93%
450 W332.7 W38.67 V × 8.6 A84.1 W93%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Independent reliability testing

Kiwa PVEL Scorecard · RETC PV Module Index
2021
PVEL Top Performer
this series
2
Tests passed as Top Performer
LID+LETID, TC
9
PVEL Scorecards
LONGi named Top Performer, 2017–2026
2023, 2024, 2025, 2026
RETC Overall Highest Achiever
LONGi, manufacturer level

PVEL Top Performer tests

YearProductTests
2021LR4-72HIH-xxxMLID+LETIDTC

RETC PV Module Index — LONGi

YearRecognition
2023Overall Highest Achiever; High Achievement in Performance (Pan file performance, Module efficiency, Lid resistance); High Achievement in Quality (Thresher test); High Achievement in Reliability (Thermal cycle test, SDML, Damp heat test)
2024Overall Highest Achiever
2025Overall Highest Achiever
2026Overall Highest Achiever; High achievement in performance; High achievement in reliability; Performance discipline high achiever (Iam, Letid, PAN file, PTC-to-STC); Quality discipline high achiever (BOM verification); Reliability discipline high achiever (Damp heat, Hdt, Pid, Sdml, Tc, Uvid)

Inverter compatibility & string sizing

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · NLR PVWatts v8 · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
52.5 V
Voc when cold
per panel
33.2 V
Vmp when hot
per panel
11
Max panels / string
max DC 600 V
2
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above. β is the CEC-measured coefficient; NEC 690.7 calculations use the datasheet value.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet2–11
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet3–11
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet4–11
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window8–9

Microinverters (one per panel)

MicroinverterRecommended module powerMax DC inputMPPTVoc cold / Vmp hotCheckDC/AC
Enphase IQ8PLUS-72-2-US235–440 W60 V29–45 V52.5 / 33.2 V✓ Within range1.5
Enphase IQ8X-80-M-US320–540 W79.5 V43–60 V52.5 / 33.2 V✗ Not a match: module voltage below MPPT range1.14
APsystems (Alt Power System) DS3-L265–570 W60 V28–45 V52.5 / 33.2 V✓ Within range0.56
Enphase IQ8M-72-2-US260–460 W60 V30–45 V52.5 / 33.2 V✓ Within range1.34
Enphase IQ8A-72-2-US295–500 W60 V32–45 V52.5 / 33.2 V✓ Within range1.25
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,67672911,6656.08
Palmdale1,83579812,7726.69
Chula Vista1,69673811,8046.11
Huntington Beach1,64371511,4355.89
Riverside1,69673811,8046.21
Santa Clarita1,72475011,9996.28
761Jan762Feb978Mar1,080Apr1,067May1,134Jun1,194Jul1,208Aug1,057Sep932Oct801Nov693DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Compare with similar 435 W panels

CEC PV Module List (Oct 7, 2026) · datasheets · Kiwa PVEL Scorecard · building permits
PanelPmaxEfficiencyγ Pmax (CEC)Voc, VIsc, AWarrantyPVEL (product / brand)SoCal permits (series)
LONGi LR4-72HIH-435M435 W≈20%−0.34049.411.26—product 2021—
Canadian Solar CS3N-430MS430 W≈21.8%−0.33245.711.8625 yrproduct 202346
Qcells Q.TRON BLK M-G2+ 435435 W≥22.3%−0.27639.613.8225 / 25 yrbrand 11× (2016–2026)40
Silfab Solar SIL-435QD435 W≈22.3%−0.29438.9414.0525 / 30 yrbrand 7× (2017–2025)39
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.

About LONGi

CEC PV Module List (Oct 7, 2026) · Kiwa PVEL Scorecard · RETC PV Module Index · building permits

Other series by SoCal permits

LR4-60HPB-xxxM · 193LR5-54HABB-xxxM · 64LR5-54HPB-xxxM · 22LR4-60HPH-xxxM · 19LR5-72HBD-xxxM · 1LR4-60HBD-xxxM · 1

Questions & answers

How efficient is the LONGi LR4-72HIH-435M?

Calculated from the panel area (2.17 m²): about 20% for the 435 W class. 435 W over 2.17 m² equals about 200 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 729 kWh per year per 435 W panel in Los Angeles and about 798 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.340 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 17.6% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 2–11 panels per string (Voc at 2 °C = 52.5 V, Vmp at 74 °C cell = 33.2 V). Final design must follow the inverter manual and NEC 690.7.

Does it work with Enphase IQ8PLUS-72-2-US microinverters?

Voltage check against the Enphase datasheet: Voc when cold 52.5 V vs max input 60 V; Vmp when hot 33.2 V vs MPPT low 29 V; recommended module power 235–440 W. Confirm on the microinverter maker’s compatibility list.

Has this panel been reliability-tested?

LR4-72HIH-xxxM was a PVEL Top Performer in 2021 (LID+LETID, TC).

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. Canadian Solar — manufacturer datasheet “HiKu Mono PERC CS3N-400|405|410|415|420|425MS MORE POWER”.
  3. Qcells — manufacturer datasheet “Q.TRON BLK M-G2+ SERIES 415–440 Wp”.
  4. Silfab Solar — datasheet NTC SIL-420 QD CELL TECHNOLOGY.
  5. Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists 2017–2026.
  6. RETC — PV Module Index reports 2023–2026.
  7. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  8. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  9. Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
  10. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  11. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).