Cali-GrafCali-Graf
Solar panelLONGi

LONGi LR4-60HPB-355M

120 half-cut cells. Power classes 335–370 W in the CEC list.

CEC listed · Oct 15, 2019UL 61730PVEL Top Performer 2021, 2022Installed in 193 SoCal permits
Power class
  • Power (STC)355 WCEC nameplate
  • Efficiency≈20.1%calculated from area
  • %/°C Pmax−0.339CEC listing test
  • PTC / STC93.4%PTC 332 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · 8 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
LR4-60HPB-335M335 W39.9010.7632.7010.25≈18.5%312 WOct 15, 2019
LR4-60HPB-340M340 W40.1010.8432.9010.34≈18.8%317 WOct 15, 2019
LR4-60HPB-345M345 W40.2011.0634.2010.09≈19.5%322 WOct 15, 2019
LR4-60HPB-350M350 W40.4011.1634.4010.18≈19.8%327 WOct 15, 2019
LR4-60HPB-355M355 W40.6011.2534.6010.27≈20.1%332 WOct 15, 2019
LR4-60HPB-360M360 W40.8011.3334.8010.35≈20.3%336 WOct 15, 2019
LR4-60HPB-365M365 W41.0011.4135.0010.43≈20.6%341 WOct 15, 2019
LR4-60HPB-370M370 W41.2011.5035.2010.52≈20.9%346 WMay 21, 2020
≈ efficiency = Pmax ÷ CEC-listed area 1.81 m².

Build & dimensions

CEC PV Module List (Oct 7, 2026)

Heat & cold behaviour

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
CEC listing test
Pmax coefficient γ−0.339 %/°C
Voc coefficient β−0.266 %/°C
Isc coefficient α+0.040 %/°C
Operating cell temperatureNOCT 45.2 °C
Vmp coefficient ≈ γ − α (CEC); used only for the hot-roof voltage estimate.

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
335 W245.1 W30.95 V × 7.92 A62.4 W93%
340 W248.7 W31.14 V × 7.99 A63.3 W93%
345 W253.4 W31.46 V × 8.06 A64.7 W94%
350 W257.2 W31.65 V × 8.13 A65.6 W94%
355 W261 W31.83 V × 8.2 A66.6 W94%
360 W264.5 W32.01 V × 8.26 A67.5 W94%
365 W268.1 W32.2 V × 8.33 A68.4 W94%
370 W272 W32.38 V × 8.4 A69.4 W94%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Independent reliability testing

Kiwa PVEL Scorecard · RETC PV Module Index
2021, 2022
PVEL Top Performer
this series
4
Tests passed as Top Performer
LID+LETID, MSS, PID, TC
9
PVEL Scorecards
LONGi named Top Performer, 2017–2026
2023, 2024, 2025, 2026
RETC Overall Highest Achiever
LONGi, manufacturer level

PVEL Top Performer tests

YearProductTests
2021LR4-60HPB-xxxMMSS
2022LR4-60HPB-xxxMLID+LETIDMSSPIDTC

Tested bill of materials

Details describe the tested sample, not every module of the series.

RETC PV Module Index — LONGi

YearRecognition
2023Overall Highest Achiever; High Achievement in Performance (Pan file performance, Module efficiency, Lid resistance); High Achievement in Quality (Thresher test); High Achievement in Reliability (Thermal cycle test, SDML, Damp heat test)
2024Overall Highest Achiever
2025Overall Highest Achiever
2026Overall Highest Achiever; High achievement in performance; High achievement in reliability; Performance discipline high achiever (Iam, Letid, PAN file, PTC-to-STC); Quality discipline high achiever (BOM verification); Reliability discipline high achiever (Damp heat, Hdt, Pid, Sdml, Tc, Uvid)

Inverter compatibility & string sizing

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · NLR PVWatts v8 · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
43.1 V
Voc when cold
per panel
28.2 V
Vmp when hot
per panel
13
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above. β is the CEC-measured coefficient; NEC 690.7 calculations use the datasheet value.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet3–13
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet3–13
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet4–13
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window9–11

Microinverters (one per panel)

MicroinverterRecommended module powerMax DC inputMPPTVoc cold / Vmp hotCheckDC/AC
Enphase IQ8PLUS-72-2-US235–440 W60 V29–45 V43.1 / 28.2 V⚠ Works; below MPPT at peak heat1.22
Enphase IQ8X-80-M-US320–540 W79.5 V43–60 V43.1 / 28.2 V✗ Not a match: module voltage below MPPT range0.93
APsystems (Alt Power System) DS3-L265–570 W60 V28–45 V43.1 / 28.2 V✓ Within range0.46
Enphase IQ8M-72-2-US260–460 W60 V30–45 V43.1 / 28.2 V⚠ Works; below MPPT at peak heat1.09
Enphase IQ8A-72-2-US295–500 W60 V32–45 V43.1 / 28.2 V⚠ Works; below MPPT at peak heat1.02
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,67659511,9006.08
Palmdale1,83565113,0286.69
Chula Vista1,69660212,0426.11
Huntington Beach1,64358311,6655.89
Riverside1,69660212,0426.21
Santa Clarita1,72461212,2406.28
777Jan777Feb998Mar1,102Apr1,088May1,157Jun1,218Jul1,233Aug1,078Sep951Oct817Nov707DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Who installs LR4-60HPB-xxxM panels in SoCal

building permits · CSLB License Master
193
Permits naming this series
Jan 2021 – Sep 2026
5
Licensed installers
CSLB license on the permit
3
Jurisdictions so far
LA County (unincorp.) (176), Palmdale (15), Los Angeles (2)

Permits over time

5Q1 ’211643Q3 ’212916Q1 ’221739Q3 ’2273Q1 ’2300Q3 ’23011Q1 ’2450Q3 ’2400Q1 ’2501Q3 ’2500Q1 ’2601Q3 ’26permits per quarter

Power class named in permit

355 W
100
350 W
75
360 W
12
365 W
5
345 W
1

Top ZIP codes

  • ZIP 9100138
  • ZIP 9172222
  • ZIP 9121417
  • ZIP 9101616
  • ZIP 9170212
  • ZIP 9172412
  • ZIP 9355011
  • ZIP 917448
  • Other ZIP codes13

Typical system

median 5.6 kW, 15 panels (n = 185)

Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.

Installed together with

building permits

Microinverters

Enphase IQ7
22
Enphase IQ8+
16
Enphase IQ7+
10

Inverters

SolarEdge SE…H (HD-Wave)
106
Delta Electronics Ex-TL-US
4
Delta Electronics Mx-TL-US
2

Optimizers

SolarEdge Power Optimizer
72

Batteries

Enphase IQ Battery 5P
15
Number of permits naming both this panel series and the product; 161 of 193 permits list other equipment.

Compare with similar 355 W panels

CEC PV Module List (Oct 7, 2026) · Kiwa PVEL Scorecard · Qcells datasheet · building permits
PanelPmaxEfficiencyγ Pmax (CEC)Voc, VIsc, APVEL (product / brand)SoCal permits (series)
LONGi LR4-60HPB-355M355 W≈20.1%−0.33940.611.25product 2021, 2022193
REC Group REC355AA355 W≈21.1%−0.2794410.19brand 9× (2016–2025)30
Trina Solar TSM-355DE06X.05(II)355 W≈19.5%−0.33944.610.24product 202223
Qcells Q.PEAK DUO-G8+ 355355 W≥19.8%−0.34340.9510.79product 202220
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.

About LONGi

CEC PV Module List (Oct 7, 2026) · Kiwa PVEL Scorecard · RETC PV Module Index · building permits

Other series by SoCal permits

LR5-54HABB-xxxM · 64LR5-54HPB-xxxM · 22LR4-60HPH-xxxM · 19LR5-72HBD-xxxM · 1LR4-60HBD-xxxM · 1LR5-78HBD-xxxM

Questions & answers

How efficient is the LONGi LR4-60HPB-355M?

Calculated from the panel area (1.77 m²): about 20.1% for the 355 W class. 355 W over 1.77 m² equals about 201 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 595 kWh per year per 355 W panel in Los Angeles and about 651 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.339 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 17.6% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–13 panels per string (Voc at 2 °C = 43.1 V, Vmp at 74 °C cell = 28.2 V). Final design must follow the inverter manual and NEC 690.7.

Does it work with APsystems (Alt Power System) DS3-L microinverters?

Voltage check against the APsystems (Alt Power System) datasheet: Voc when cold 43.1 V vs max input 60 V; Vmp when hot 28.2 V vs MPPT low 28 V; recommended module power 265–570 W. Confirm on the microinverter maker’s compatibility list.

Has this panel been reliability-tested?

LR4-60HPB-xxxM was a PVEL Top Performer in 2021, 2022 (LID+LETID, MSS, PID, TC).

Who installs it in Southern California?

Building permits name this series 193 times (Jan 2021 – Sep 2026). The most active licensed installers are Sunpower, Dutchmen Construction Incorporated, Lightyear Solar LLC.

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. Qcells — manufacturer datasheet “Q.PEAK DUO-G8+ 345-360 EN ENDURING HIGH”.
  3. Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists 2017–2026.
  4. RETC — PV Module Index reports 2023–2026.
  5. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  6. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  7. Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
  8. Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Jan 2021 – Jun 2024); City of Palmdale (Mar 2024 – Sep 2026); LADBS, City of Los Angeles (Apr 2022 – Jun 2022). Equipment matched from permit descriptions by model number.
  9. Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.
  10. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).