Cali-GrafCali-Graf
Solar panelCertainTeed

CertainTeed CTTC450HC12-08

108 half-cut cells, bifacial. Power classes 425–455 W in the CEC list.

CEC listed · Jun 2, 2025UL 61730BifacialInstalled in 3 SoCal permits
Power class
  • Power (STC)450 WCEC nameplate
  • Efficiency≈23.1%calculated from area
  • %/°C Pmax−0.303CEC listing test
  • PTC / STC94.9%PTC 427 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · 7 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
CTTC425HC12-08425 W38.3014.0532.2013.23≈21.8%403 WJun 2, 2025
CTTC430HC12-08430 W38.4014.1332.5013.28≈22.1%408 WJun 2, 2025
CTTC435HC12-08435 W38.5014.2232.8013.32≈22.3%412 WJun 2, 2025
CTTC440HC12-08440 W38.6014.3033.0013.36≈22.6%417 WJun 2, 2025
CTTC445HC12-08445 W38.8014.3833.2013.40≈22.8%422 WJun 2, 2025
CTTC450HC12-08450 W38.8014.4733.5013.44≈23.1%427 WJun 2, 2025
CTTC455HC12-08455 W39.0014.5433.8013.48≈23.3%432 WJun 2, 2025
≈ efficiency = Pmax ÷ CEC-listed area 1.95 m².

Heat & cold behaviour

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
CEC listing test
Pmax coefficient γ−0.303 %/°C
Voc coefficient β−0.229 %/°C
Isc coefficient α+0.049 %/°C
Operating cell temperatureNOCT 43.5 °C
Vmp coefficient ≈ γ − α (CEC); used only for the hot-roof voltage estimate.

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
425 W312.5 W28 V × 11.16 A79.7 W94%
430 W320.6 W28.4 V × 11.29 A81.6 W95%
435 W327.8 W28.7 V × 11.42 A83.5 W96%
440 W335 W29 V × 11.55 A85.5 W97%
445 W342.2 W29.3 V × 11.68 A87.1 W98%
450 W350.8 W29.7 V × 11.81 A89.4 W99%
455 W358.5 W30 V × 11.95 A91.4 W100%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Inverter compatibility & string sizing

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · NLR PVWatts v8 · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
40.8 V
Voc when cold
per panel
27.7 V
Vmp when hot
per panel
14
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above. β is the CEC-measured coefficient; NEC 690.7 calculations use the datasheet value.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet3–14
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet3–14
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet4–14
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window9–12

Microinverters (one per panel)

MicroinverterRecommended module powerMax DC inputMPPTVoc cold / Vmp hotCheckDC/AC
Enphase IQ8X-80-M-US320–540 W79.5 V43–60 V40.8 / 27.7 V✗ Not a match: module voltage below MPPT range1.18
APsystems (Alt Power System) DS3-L265–570 W60 V28–45 V40.8 / 27.7 V⚠ Works; below MPPT at peak heat0.58
Enphase IQ8M-72-2-US260–460 W60 V30–45 V40.8 / 27.7 V⚠ Works; below MPPT at peak heat1.38
Enphase IQ8A-72-2-US295–500 W60 V32–45 V40.8 / 27.7 V⚠ Works; below MPPT at peak heat1.29
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,67675412,0676.08
Palmdale1,83582613,2126.69
Chula Vista1,69676312,2116.11
Huntington Beach1,64373911,8305.89
Riverside1,69676312,2116.21
Santa Clarita1,72477612,4136.28
788Jan788Feb1,012Mar1,117Apr1,104May1,173Jun1,236Jul1,250Aug1,093Sep964Oct829Nov717DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Who installs CTTCxxxHC12-08 panels in SoCal

building permits · CSLB License Master
3
Permits naming this series
Nov 2025 – Jul 2026
3
Licensed installers
CSLB license on the permit
3
Jurisdictions so far
Huntington Beach (1), Chula Vista (1), Palmdale (1)

Permits over time

1Nov ’250Dec0Jan ’260Feb0Mar1Apr0May0Jun1Julpermits per month

Power class named in permit

450 W
2
440 W
1
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Counts grow as more permit portals are loaded.

Compare with similar 450 W panels

CEC PV Module List (Oct 7, 2026) · datasheets · Kiwa PVEL Scorecard · building permits
PanelPmaxEfficiencyγ Pmax (CEC)Voc, VIsc, APVEL (product / brand)SoCal permits (series)
CertainTeed CTTC450HC12-08450 W≈23.1%−0.30338.814.47—3
Qcells Q.TRON BLK M-G2+ 445445 W≈22.8%−0.27640.1613.98brand 11× (2016–2026)40
Hyundai Energy Solutions HiN-T450NF(BK)450 W≈23.2%−0.29839.214.53brand 5× (2017–2025)37
REC Group REC450AA Pure-RX450 W≈22.3%−0.24865.18.81brand 9× (2016–2025)33
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.

Questions & answers

How efficient is the CertainTeed CTTC450HC12-08?

Calculated from the panel area (1.95 m²): about 23.1% for the 450 W class. 450 W over 1.95 m² equals about 231 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 754 kWh per year per 450 W panel in Los Angeles and about 826 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.303 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 15.7% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–14 panels per string (Voc at 2 °C = 40.8 V, Vmp at 74 °C cell = 27.7 V). Final design must follow the inverter manual and NEC 690.7.

Is it bifacial?

Yes. Rear gain depends on mounting height and ground reflectance.

Who installs it in Southern California?

Building permits name this series 3 times (Nov 2025 – Jul 2026). The most active licensed installers are B V I Solar, Preman A Roofing Inc, Solar Discovery Inc.

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. Qcells — manufacturer datasheet “Q.TRON BLK M-G2+ SERIES 415–440 Wp”.
  3. Hyundai Energy Solutions — datasheet [US] NF(BK)(HiN) Series (N TOPCon Bifacial) 435~445W.
  4. Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists.
  5. NLR (formerly NREL) — System Advisor Model CEC module and inverter libraries (version 2026.7.3).
  6. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  7. Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
  8. Building permits — City of Huntington Beach (Nov 2025); City of Chula Vista (Apr 2026); City of Palmdale (Jul 2026). Equipment matched from permit descriptions by model number.
  9. Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.
  10. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).