Details describe the tested sample, not every module of the series.
RETC PV Module Index — Canadian Solar
Year
Recognition
2025
Reliability High Achiever
Inverter compatibility & string sizing
Canadian Solar datasheet · Cali-Graf calculation · NLR PVWatts v8 · CEC PV Module List (Oct 7, 2026) · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
52.2 V
Voc when cold
per panel
33.4 V
Vmp when hot
per panel
11
Max panels / string
max DC 600 V
2
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above.
String inverters most named in SoCal permits
Inverter
Max DC input
MPPT
Window source
Panels per string
Tesla 1538000-xx-y
600 V
60–480 V
datasheet
2–11
Solis (Ginlong) S6-EH1P10K-H-US
600 V
80–520 V
datasheet
3–11
Solis (Ginlong) Solis-1P7.6K-4G-US
600 V
100–500 V
datasheet
3–11
Qcells Q.VOLT H7.6SX
498 V
234–498 V
CEC test window
8–9
Microinverters (one per panel)
Microinverter
Recommended module power
Max DC input
MPPT
Voc cold / Vmp hot
Check
DC/AC
Enphase IQ8X-80-M-US
320–540 W
79.5 V
43–60 V
52.2 / 33.4 V
✗ Not a match: module voltage below MPPT range
1.2
APsystems (Alt Power System) DS3-L
265–570 W
60 V
28–45 V
52.2 / 33.4 V
✓ Within range
0.58
Enphase IQ8M-72-2-US
260–460 W
60 V
30–45 V
52.2 / 33.4 V
✓ Within range
1.4
Enphase IQ8A-72-2-US
295–500 W
60 V
32–45 V
52.2 / 33.4 V
✓ Within range
1.3
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.
Expected production in Southern California
NLR PVWatts v8 · Cali-Graf calculation
City
kWh / kW / yr
kWh / panel / yr
kWh / system / yr
Sun, kWh/m²/day
Los Angeles
1,676
763
11,439
6.08
Palmdale
1,835
835
12,524
6.69
Chula Vista
1,696
772
11,575
6.11
Huntington Beach
1,643
748
11,213
5.89
Riverside
1,696
772
11,575
6.21
Santa Clarita
1,724
784
11,766
6.28
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.
Who installs CS3W-xxxMS panels in SoCal
building permits
6
Permits naming this series
Sep 2022 – Jul 2023
1
Jurisdictions so far
LA County (unincorp.) (6)
Permits over time
Power class named in permit
455 W
5
445 W
1
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.
Installed together with
building permits
Microinverters
Enphase IQ8+
3
Number of permits naming both this panel series and the product; 5 of 6 permits list other equipment.
Compare with similar 455 W panels
CEC PV Module List (Oct 7, 2026) · datasheets · Kiwa PVEL Scorecard · building permits
Panel
Pmax
Efficiency
γ Pmax (CEC)
Voc, V
Isc, A
PVEL (product / brand)
SoCal permits (series)
Canadian Solar CS3W-455MS
455 W
≥20.6%
−0.324
49.3
11.66
product 2023
6
Hyundai Energy Solutions HiN-T450NF(BK)
450 W
≈23.2%
−0.298
39.2
14.53
brand 5× (2017–2025)
37
REC Group REC455AA Pure-RX
455 W
≈22.5%
−0.248
65.6
8.84
brand 9× (2016–2025)
33
Aptos Solar DNA-120-MF10-455W
455 W
≈21%
−0.363
41.5
13.93
—
22
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.
About Canadian Solar
CEC PV Module List (Oct 7, 2026) · Kiwa PVEL Scorecard · RETC PV Module Index · building permits
ManufacturerCanadian Solar
Listed in CEC asCSI Energy Storage Co., Ltd., CSI Solar Co., Ltd., Canadian Solar
The Canadian Solar datasheet guarantees at least 20.6% module efficiency for the 455 W class (up to 21% for 465 W). 455 W over 2.14 m² equals about 213 W per square meter.
How much energy does one panel produce in Los Angeles or Palmdale?
PVWatts v8 with typical-year weather gives about 763 kWh per year per 455 W panel in Los Angeles and about 835 kWh in Palmdale (20° roof, facing south, 14% system losses).
How much power does it lose on a hot roof?
With γ = −0.34 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 17.6% below the STC rating.
How many panels fit on one string?
With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 2–11 panels per string (Voc at 2 °C = 52.2 V, Vmp at 74 °C cell = 33.4 V). Final design must follow the inverter manual and NEC 690.7.
Does it work with APsystems (Alt Power System) DS3-L microinverters?
Voltage check against the APsystems (Alt Power System) datasheet: Voc when cold 52.2 V vs max input 60 V; Vmp when hot 33.4 V vs MPPT low 28 V; recommended module power 265–570 W. Confirm on the microinverter maker’s compatibility list.
Has this panel been reliability-tested?
CS3W-xxxMS was a PVEL Top Performer in 2023 (DH, LID+LETID, PID).
Sources
California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
Canadian Solar — manufacturer datasheet “HiKu HIGH POWER MONO PERC MODULE CS3W-435|440|445|450|455|460|465MS”.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Sep 2022 – Jul 2023). Equipment matched from permit descriptions by model number.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.