Cali-GrafCali-Graf
Solar panelAptos Solar

Aptos Solar DNA-108-MF10 410

108 half-cut cells, PERC. Power classes 390–415 W in the CEC list; datasheet covers 400–415 W.

CEC listed · Nov 1, 2022UL 61730PERCSeen in 1 SoCal permit
Power class
  • Power (STC)410 WCEC nameplate
  • Efficiency≥21.0%datasheet minimum
  • %/°C Pmax−0.35CEC test: −0.353
  • PTC / STC93.8%PTC 384 W (CEC)

Power classes

CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation · Aptos Solar datasheet · 6 models
ModelPmaxVoc, VIsc, AVmp, VImp, AEfficiencyPTCCEC listed
DNA-108-MF10-390W390 W36.8513.6130.6412.73≈20.0%365 WNov 1, 2022
DNA-108-MF10-395W395 W36.9813.7030.8412.81≈20.2%370 WNov 1, 2022
DNA-108-MF10-400W400 W37.0413.7931.0112.90≥20.5%375 WNov 1, 2022
DNA-108-MF10-405W405 W37.2313.8731.2112.98≥20.8%380 WNov 1, 2022
DNA-108-MF10-410W410 W37.3213.9531.4513.04≥21.0%384 WNov 1, 2022
DNA-108-MF10-415W415 W37.7013.9131.5013.18≥21.2%389 WMay 21, 2025
≈ efficiency = Pmax ÷ panel area 1.953 m² (datasheet size) for classes outside the datasheet.

Build & dimensions

Aptos Solar datasheets · Cali-Graf calculation · CEC PV Module List (Oct 7, 2026)

Heat & cold behaviour

Aptos Solar datasheet · CEC PV Module List (Oct 7, 2026) · Cali-Graf calculation
DatasheetCEC listing test
Pmax coefficient γ−0.35 %/°C−0.353 %/°C
Voc coefficient β−0.27 %/°C−0.272 %/°C
Isc coefficient α+0.05 %/°C+0.054 %/°C
Vmp coefficient≈ −0.41 %/°C—
Operating cell temperatureNMOT 45 °CNOCT 43.6 °C
Vmp coefficient ≈ γ − α (datasheet); used only for the hot-roof voltage estimate.

At normal operating conditions (NOCT, 800 W/m²) — datasheet

ClassPmax, WVoc, VIsc, AVmp, VImp, A
400 W299.035.1112.1128.7810.39
405 W303.035.1912.1928.8510.50
410 W307.035.2812.2728.9210.60
415 W311.035.3612.3528.9910.71

Away from lab conditions — CEC listing test points

ClassPmax at NOCTVmp × Imp at NOCTPmax at 200 W/m²Low-light efficiency vs STC
390 W287.9 W28.02 V × 10.27 A75.4 W97%
395 W291.6 W28.2 V × 10.34 A76.4 W97%
400 W295.2 W28.36 V × 10.41 A77.3 W97%
405 W299 W28.54 V × 10.48 A78.3 W97%
410 W302.7 W28.76 V × 10.52 A79.3 W97%
415 W309.3 W29.8 V × 10.38 A80.7 W97%
Pmax = Vmp × Imp from the CEC listing; low-light efficiency = Pmax at 200 W/m² ÷ (20% of STC Pmax).

Electrical & strength ratings

Aptos Solar datasheet
Packaging: 31 per pallet

Certifications

CEC PV Module List (Oct 7, 2026) · Aptos Solar datasheet
UL 61730UL 1703Fire rating Type 1 (UL 61730)

Warranty & degradation

Aptos Solar datasheet

Independent reliability testing

RETC PV Module Index
2
RETC PV Module Index
Aptos Solar recognized 2023–2024
This exact series is not listed in published PVEL Top Performer tables. Results below are for the manufacturer.

RETC PV Module Index — Aptos Solar

YearRecognition
2023High Achievement in Performance (LeTID RESISTANCE)
2024Test Category High Achiever

Inverter compatibility & string sizing

Aptos Solar datasheet · Cali-Graf calculation · NLR PVWatts v8 · CEC PV Module List (Oct 7, 2026) · inverter datasheets · NLR SAM inverter library · CEC Grid Support Inverter List (Oct 7, 2026)
39.7 V
Voc when cold
per panel
25.2 V
Vmp when hot
per panel
15
Max panels / string
max DC 600 V
3
Min panels / string
MPPT from 60 V
Defaults come from NLR TMY weather (coldest hour, hottest modeled cell). Code calculations (NEC 690.7) use the ASHRAE extreme annual minimum, which is usually colder — enter it above.

String inverters most named in SoCal permits

InverterMax DC inputMPPTWindow sourcePanels per string
Tesla 1538000-xx-y600 V60–480 Vdatasheet3–15
Solis (Ginlong) S6-EH1P10K-H-US600 V80–520 Vdatasheet4–15
Solis (Ginlong) Solis-1P7.6K-4G-US600 V100–500 Vdatasheet4–15
Qcells Q.VOLT H7.6SX498 V234–498 VCEC test window10–12

Microinverters (one per panel)

MicroinverterRecommended module powerMax DC inputMPPTVoc cold / Vmp hotCheckDC/AC
Enphase IQ8PLUS-72-2-US235–440 W60 V29–45 V39.7 / 25.2 V⚠ Works; below MPPT at peak heat1.41
Enphase IQ8X-80-M-US320–540 W79.5 V43–60 V39.7 / 25.2 V✗ Not a match: module voltage below MPPT range1.08
APsystems (Alt Power System) DS3-L265–570 W60 V28–45 V39.7 / 25.2 V⚠ Works; below MPPT at peak heat0.53
Enphase IQ8M-72-2-US260–460 W60 V30–45 V39.7 / 25.2 V⚠ Works; below MPPT at peak heat1.26
Enphase IQ8A-72-2-US295–500 W60 V32–45 V39.7 / 25.2 V✗ Not a match: module voltage below MPPT range1.17
Voltage check against the microinverter datasheets — confirm the pairing on the manufacturer’s module compatibility list. Rows appear only when the panel’s power is inside the microinverter’s recommended module power range.
SolarEdge and other optimizer-based systems size strings by the optimizer rules — use the manufacturer’s designer. Reference inverters: most named in SoCal permits since Oct 2024.

Expected production in Southern California

NLR PVWatts v8 · Cali-Graf calculation
CitykWh / kW / yrkWh / panel / yrkWh / system / yrSun, kWh/m²/day
Los Angeles1,67668711,6826.08
Palmdale1,83575212,7906.69
Chula Vista1,69669511,8216.11
Huntington Beach1,64367411,4525.89
Riverside1,69669511,8216.21
Santa Clarita1,72470712,0166.28
763Jan763Feb979Mar1,082Apr1,069May1,135Jun1,196Jul1,210Aug1,058Sep933Oct802Nov694DeckWh per month · Los Angeles
Estimate for comparison, not a quote: shading, roof orientation and local losses change real output. Roof mount, 20° tilt, south, 14% system losses.

Compare with similar 410 W panels

CEC PV Module List (Oct 7, 2026) · Qcells datasheet · Kiwa PVEL Scorecard · building permits
PanelPmaxEfficiencyγ Pmax (CEC)Voc, VIsc, APVEL (product / brand)SoCal permits (series)
Aptos Solar DNA-108-MF10 410410 W≥21%−0.35337.3213.95—1
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W≈20.9%−0.33745.3711.2product 2022, 2023221
JA Solar JAM54S31-405/MR405 W≈21.3%−0.32937.2313.87product 2023, 2024152
REC Group REC410AA Pure410 W≈22.9%−0.2564910.35brand 9× (2016–2025)66
Same fields from the same sources for every row; ≈ efficiency is calculated from the listed area. Comparable series: other brands, same product group, power range covering this class.

Documents

manufacturer documents

About Aptos Solar

CEC PV Module List (Oct 7, 2026) · RETC PV Module Index · building permits

Other series by SoCal permits

DNA-144-MF26 · 23DNA-120-MF10 · 22DNA-120-MF26 · 8DNA-120-BF10 · 2DNA-108-BF10 · 1DNA-144-BF26 · 1

Questions & answers

How efficient is the Aptos Solar DNA-108-MF10 410?

The Aptos Solar datasheet guarantees at least 21% module efficiency for the 410 W class (up to 21.2% for 415 W). 410 W over 1.95 m² equals about 210 W per square meter.

How much energy does one panel produce in Los Angeles or Palmdale?

PVWatts v8 with typical-year weather gives about 687 kWh per year per 410 W panel in Los Angeles and about 752 kWh in Palmdale (20° roof, facing south, 14% system losses).

How much power does it lose on a hot roof?

With γ = −0.35 %/°C, at a 77 °C cell temperature (hottest modeled hour in Palmdale) output is about 18.3% below the STC rating.

How many panels fit on one string?

With the Tesla 1538000-xx-y (max DC 600 V, MPPT from 60 V, datasheet) in Los Angeles the calculator gives 3–15 panels per string (Voc at 2 °C = 39.7 V, Vmp at 74 °C cell = 25.2 V). Final design must follow the inverter manual and NEC 690.7.

What does the warranty cover?

30 years on the product (manufacturer datasheet).

How big and heavy is it?

67.8 × 44.6 × 1.38 in (1,722 × 1,134 × 35 mm), 47.4 lb (21.5 kg).

What fire rating does it have?

UL 61730 fire rating Type 1 per datasheet.

Sources

  1. California Energy Commission — Solar Equipment Lists, PV Module List, Inverter List (snapshot Oct 7, 2026).
  2. Aptos Solar — datasheet Legacy Products.
  3. Aptos Solar — manufacturer datasheet “108-Monofacial Solar for Innovators aptos”.
  4. Qcells — manufacturer datasheet “Q.PEAK DUO BLK ML-G10+ ENDURING HIGH PERFORMANCE”.
  5. Aptos Solar — document library on the manufacturer’s website (links above).
  6. Kiwa PVEL — PV Module Reliability Scorecard, Top Performer lists.
  7. RETC — PV Module Index reports 2023–2024.
  8. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  9. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Chula Vista, Huntington Beach, Riverside, Santa Clarita.
  10. Inverter datasheets — APsystems (Alt Power System), Enphase, Solis (Ginlong), Tesla (manufacturer documents).
  11. Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Oct 2025). Equipment matched from permit descriptions by model number.
  12. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).