MicroinverterQcells

Qcells Q.MI.349B-G1

Microinverter. 1 model, 349 W AC at 240 V.

UL 1741 SBCEC listed · May 1, 2024Installed in 69 SoCal permits
  • Rated AC power349 W
  • CEC weighted efficiency97.0%

DC input (PV side)

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

AC output (grid side)

CEC Grid Support Inverter List (Oct 7, 2026)

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Battery & storage pairings

building permits

Batteries installed with it in SoCal

Tesla Powerwall 3
40
Qcells Q.HOME
17
Tesla Powerwall 3 Expansion
8

What it's installed with

building permits

Panels

Qcells Q.TRON
57
Qcells Q.PEAK DUO
12

Batteries

Tesla Powerwall 3
40
Qcells Q.HOME
17
Tesla Powerwall 3 Expansion
8

Gateways & interfaces

Qcells Q.HOME Hub
12
Tesla Backup Switch
9
Tesla Backup Gateway
4
IronRidge (model not specified)
3
Permits naming both; 69 of 69 permits list other equipment.

Installed in Southern California

building permits
69
Permits name it
Aug 2025 – Sep 2026
4
Jurisdictions so far
Palmdale (31), LA County (unincorp.) (25), Chula Vista (12), San Diego
1,030
Units listed
median 15 per permit
6.5 kW
Typical system
median of 61 permits

Permits over time

3Aug ’250Sep0Oct6Nov0Dec1Jan ’260Feb1Mar0Apr5May10Jun8Jul12Aug23Seppermits per month

Model named in permit

Q.MI.349B-G1
68

Top ZIP codes

  • ZIP 9355015
  • ZIP 9355113
  • ZIP 935523
  • ZIP 917483
  • ZIP 910013
  • ZIP 910072
  • ZIP 910062
  • ZIP 935102
  • Other ZIP codes14
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.

Who installs Q.MI.xxxB-G1 in SoCal

building permits · CSLB License Master

Compare with similar 349 W inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
Qcells Q.MI.xxxB-G1349 W–349 W97.0%31–40 VYes202468
Enphase Energy IQ8 Series240 W–633 W97.5%25–95 V44 of 4520251,104
Enphase Energy IQ7 Series190 W–384 W97.5%22–64 V114 of 1192022471
Hoymiles HM-xxxNT295 W–1.44 kW96.5%29–48 V11 of 1220233
Enphase Energy IQ9 Series405 W–440 W97.5%28–45 VYes2026—
Same type and grid voltage, power range covering this model; same fields from the same sources.

About Qcells

CEC Grid Support Inverter List (Oct 7, 2026)

Other series

Q.MI.380C-G2Q.MI.xxxB-P2Q.MICRO.380C-G2Q.MICRO.xxxB-P2

Questions & answers

How efficient is the Qcells Q.MI.xxxB-G1?

The California Energy Commission lists a weighted efficiency of 97.0% for Qcells Q.MI.xxxB-G1 models, measured at six power levels and three DC voltages.

Is the Qcells Q.MI.xxxB-G1 certified to UL 1741 SB?

Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.

Can the Qcells Q.MI.xxxB-G1 be used with a battery?

In Southern California permits it was installed with Tesla Powerwall 3, Qcells Q.HOME, Tesla Powerwall 3 Expansion.

What is the Q.MI.349B-G1’s DC input voltage range?

CEC tested it at 31–40 V DC.

Who installs it in Southern California?

Building permits name this series 69 times (Aug 2025 – Sep 2026). The most active licensed installers are Qcells For New Homes, Lgcy Electric, Capital Energy LLC.

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  3. Building permits — City of Palmdale (May 2026 – Sep 2026); Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Aug 2025 – Sep 2026); City of Chula Vista (Jun 2026 – Sep 2026); San Diego County (May 2026). Equipment matched from permit descriptions by model number.
  4. Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.