Microinverter. 6 models, 590 W–958 W AC at 208 V / 240 V.
UL 1741 SB · 5 of 6 modelsCEC listed · Mar 1, 2021Rapid shutdown
Model
Rated AC power720 W
CEC weighted efficiency96.5%
Max DC input65 V
Models & power ratings
CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library · 6 models
Model
Nominal AC
Grid voltage
CEC continuous
Rated AC (SAM)
CEC weighted eff.
DC test window
CEC listed
UL 1741 SB
HMS-600-2T-NA
590 W
240 V
591 W
591 W
96.5%
29–48 V
Mar 1, 2021
—
HMS-700-2T-NA
696 W
240 V
642 W
642 W
96.5%
33–48 V
Mar 1, 2021
SB
HMS-800-2T-NA
766 W
240 V
726 W
726 W
96.5%
34–48 V
Mar 1, 2021
SB
HMS-900-2T-NA
820 W
240 V
827 W
827 W
96.5%
36–48 V
Mar 13, 2023
SB
HMS-1000-2T-NA
958 W
208 V
965 W
965 W
96.5%
38–48 V
Mar 13, 2023
SB
HMS-1000-2T-NA
958 W
240 V
967 W
967 W
96.5%
38–48 V
Mar 13, 2023
SB
DC input (PV side)
Hoymiles datasheet · CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
Max DC input voltage65 V
MPPT operating range16–60 V
CEC test DC voltages (min / nom / max)34 / 42 / 48 V
Start-up voltage25 V
Strings per MPPT1
Max input current14 A
Max short-circuit current20 A
DC input at rated output (CEC test)755 W
AC output (grid side)
Hoymiles datasheets · CEC Grid Support Inverter List (Oct 7, 2026)
Rated AC power720 W
Max apparent power800 VA
CEC-measured continuous output726 W
Grid voltage208 V / 240 V
Phase208 V (1-phase of 3-phase service), split-phase 120/240 V
Frequency60 Hz
Max continuous output current3 A
Efficiency
CEC Grid Support Inverter List (Oct 7, 2026) · Hoymiles datasheet · NLR SAM inverter library
CEC weighted efficiency96.5%
Peak efficiency96.7%
Night-time standby (tare)0.11 W
Power to start converting2.8 W
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.
Grid & smart-inverter certification
CEC Grid Support Inverter List (Oct 7, 2026) · Hoymiles datasheet
UL 1741 SB (3rd ed.)5 of 6 models — CSA Group, certificate Jan 18, 2023
UL 1741 SA (SA8–SA13)3 of 6 models — CSA Group
Firmware tested (SA)V01.01.00
Volt-VAr with reactive power priority (SA13)3 of 6 models
Freq-Watt / Volt-Watt (SA14–15)3 of 6 models
Disable permit service / limit active power (SA17–18)3 of 6 models
CSIP (IEEE 2030.5) conformanceVia gateway during testing (Y*)
Monitor key data & scheduling (Rule 21 Phase 3)Yes (attested Mar 13, 2023)
CEC listedMar 1, 2021
Last CEC updateMar 13, 2023
Standards listed on the datasheetUL 1741, UL 1741 SA, IEEE 1547, CSA C22.2, CA Rule 21, UL 1741 SB, UL 1741 CRD, UL 1699B, UL 1998, FCC Part 15, NEC 690.12 (rapid shutdown), UL 6703
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.
The California Energy Commission lists a weighted efficiency of 96.5% for Hoymiles HMS-xxx-2T-NA models, measured at six power levels and three DC voltages. The datasheet states a peak efficiency of 96.7%.
What sizes does the Hoymiles HMS-xxx-2T-NA come in?
The CEC list includes 6 models from 590 W to 958 W AC: HMS-600-2T-NA, HMS-700-2T-NA, HMS-800-2T-NA, HMS-900-2T-NA, HMS-1000-2T-NA, HMS-1000-2T-NA.
Is the Hoymiles HMS-xxx-2T-NA certified to UL 1741 SB?
Yes — the CEC Grid Support Inverter List shows UL 1741 SB for 5 of 6 models.
What is the HMS-800-2T-NA’s DC input voltage range?
Max DC input voltage is 65 V per the datasheet. MPPT operating range 16–60 V. CEC tested it at 34–48 V DC.
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
Hoymiles — manufacturer datasheet “Open Energy For All Microinverter Description Datasheet Hoymiles new microinverter HMS-1000 series are suitable for”.
Hoymiles — manufacturer datasheet “PRODUCT BROCHURE 2023 FOR NORTH AMERICA”.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Southern California permit portals. Equipment matched from permit descriptions.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).