Disable permit service / limit active power (SA17–18)No
CSIP (IEEE 2030.5) conformanceVia gateway during testing (Y*)
Monitor key data & scheduling (Rule 21 Phase 3)Yes (attested Oct 11, 2024)
CEC listedOct 11, 2024
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.
Panel compatibility & string sizing
NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
EZ1-LV: max DC 45 V · MPPT 28–45 V (CEC test window)
Most-permitted panels in Southern California
Panel
Power
Voc cold / Vmp hot
Check
DC/AC
Installed together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410
410 W
48.1 / 30.6 V
✗ Cold Voc above max input
0.45
—
Qcells Q.PEAK DUO BLK ML-G10+ 410
410 W
48.1 / 30.6 V
✗ Cold Voc above max input
0.45
—
LONGi LR5-54HABB-400M
400 W
39.3 / 25.3 V
⚠ Below MPPT at peak heat
0.44
—
JA Solar JAM54S31-405/MR
405 W
39.4 / 25.5 V
⚠ Below MPPT at peak heat
0.44
—
Hyundai Solutions HiN-T440NF(BK)
440 W
40.9 / 27 V
⚠ Below MPPT at peak heat
0.48
—
Silfab Solar SIL-440QD
440 W
41.1 / 28 V
⚠ Below MPPT at peak heat
0.48
—
Qcells Q.TRON BLK M-G2+ 430
430 W
41.3 / 28 V
⚠ Below MPPT at peak heat
0.47
—
Qcells Q.TRON BLK M-G2.H+ 430
430 W
41.3 / 28 V
⚠ Below MPPT at peak heat
0.47
—
REC Group REC460AA Pure-RX
460 W
68.8 / 47.1 V
✗ Cold Voc above max input
0.5
—
Elin (Sirius PV) ELNSM54M-HC-410
410 W
39.3 / 25.3 V
⚠ Below MPPT at peak heat
0.45
—
Qcells Q.TRON BLK M-G2.C+ 430
430 W
41.3 / 28 V
⚠ Below MPPT at peak heat
0.47
—
Tesla TSP-420
420 W
43.4 / 27.7 V
⚠ Below MPPT at peak heat
0.46
—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.
Compare with similar 900 W inverters
CEC Grid Support Inverter List (Oct 7, 2026) · building permits
Inverter
Power
CEC weighted eff.
DC test window
UL 1741 SB
Latest CEC
SoCal permits
APsystems (Altenergy Power System) EZx-LV
900 W–900 W
95.0%
28–45 V
Yes
2024
0
Northern Electric & Power BDM-xxxx-LV
1.2 kW–1.6 kW
96.5%
22–55 V
Yes
2025
—
Same type and grid voltage, power range covering this model; same fields from the same sources.
About APsystems (Altenergy Power System)
CEC Grid Support Inverter List (Oct 7, 2026)
ManufacturerAPsystems (Altenergy Power System)
Listed in CEC asAltenergy Power System Inc.
Websiteapsystems.com
Models on CEC lists101
Other series
QSxxxxQT2QTx-480QS1
Questions & answers
How efficient is the APsystems (Altenergy Power System) EZx-LV?
The California Energy Commission lists a weighted efficiency of 95.0% for APsystems (Altenergy Power System) EZx-LV models, measured at six power levels and three DC voltages.
Is the APsystems (Altenergy Power System) EZx-LV certified to UL 1741 SB?
Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.
What is the EZ1-LV’s DC input voltage range?
CEC tested it at 28–45 V DC.
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Southern California permit portals. Equipment matched from permit descriptions.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!