Cali-GrafCali-Graf
Hybrid inverterTesla

Tesla 1707000-XX-Y

Hybrid inverter, dc-coupled hybrid (pv + battery). 2 models, 10 kW–11.5 kW AC at 240 V.

UL 1741 SBCEC listed · Jan 11, 2024Rapid shutdownInstalled in 6 SoCal permits
Model
  • Rated AC power10 kW
  • CEC weighted efficiency96.2%

Models & power ratings

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library · building permits · 2 models
ModelNominal ACGrid voltageCEC continuousRated AC (SAM)CEC weighted eff.DC test windowCEC listedUL 1741 SBIn permits
1707000-XX-Y10 kW240 V9.99 kW9.99 kW96.2%270–480 VAug 1, 2024SB6
1707000-XX-Y11.5 kW240 V11.5 kW11.5 kW97.5%270–480 VJan 11, 2024SB6
Some models are also on the CEC Battery Inverter list — one product, two listings.
4 more listings are microinverters sold only inside AC modules — not shown here.

DC input (PV side)

Tesla datasheet · CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

AC output (grid side)

CEC Grid Support Inverter List (Oct 7, 2026) · Tesla datasheet

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026) · Tesla datasheet
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Safety & protection

Tesla datasheet

Monitoring & communication

Tesla datasheet

Panel compatibility & string sizing

NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
1707000-XX-Y: max DC 480 V · MPPT 270–480 V (CEC test window)

Most-permitted panels in Southern California

PanelPowerVoc coldVmp hotPanels per stringInstalled together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410410 W48.1 V30.6 V9–9—
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W48.1 V30.6 V9–9—
LONGi LR5-54HABB-400M400 W39.3 V25.3 V11–12—
JA Solar JAM54S31-405/MR405 W39.4 V25.5 V11–12—
Hyundai Solutions HiN-T440NF(BK)440 W40.9 V27 V10–11—
Silfab Solar SIL-440QD440 W41.1 V28 V10–11—
Qcells Q.TRON BLK M-G2+ 430430 W41.3 V28 V10–11—
Qcells Q.TRON BLK M-G2.H+ 430430 W41.3 V28 V10–11—
REC Group REC460AA Pure-RX460 W68.8 V47.1 V6–6—
Elin (Sirius PV) ELNSM54M-HC-410410 W39.3 V25.3 V11–12—
Qcells Q.TRON BLK M-G2.C+ 430430 W41.3 V28 V10–11—
Tesla TSP-420420 W43.4 V27.7 V10–11—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.

Battery & storage pairings

building permits

Batteries installed with it in SoCal

Tesla Powerwall 3 Expansion
5
Tesla Powerwall 3
4

What it's installed with

building permits

Panels

Elin Energy (Sirius PV) ELNSM54M-HC-N
2
Qcells Q.TRON
2

Batteries

Tesla Powerwall 3 Expansion
5
Tesla Powerwall 3
4
Permits naming both; 6 of 6 permits list other equipment.

Installed in Southern California

building permits
6
Permits name it
Feb 2025 – Sep 2026
3
Jurisdictions so far
Palmdale (4), Huntington Beach (1), LA County (unincorp.) (1)
9.4 kW
Typical system
median of 5 permits

Permits over time

1Feb ’2500Apr00Jun00Aug00Oct10Dec00Feb00Apr00Jun01Aug3permits per month

Model named in permit

1707000-XX-Y
6
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.

Who installs 1707000-XX-Y in SoCal

building permits · CSLB License Master

Compare with similar 10 kW inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
Tesla 1707000-XX-Y10 kW–11.5 kW96.2%270–480 VYes202412
SolarEdge SExxxxH-US3 kW–11.4 kW99.0%360–480 VYes20251,046
Delta Electronics Ex-TL-US3.33 kW–9.6 kW97.5%200–480 VYes202228
SolarEdge SExxxxxA-US3.8 kW–11.4 kW98.0%320–500 VNo202418
Growatt MIN xxxxTL-XH-US2.63 kW–11.4 kW98.0%125–480 VYes202115
Same type and grid voltage, power range covering this model; same fields from the same sources.

About Tesla

CEC Grid Support Inverter List (Oct 7, 2026)

Documents

manufacturer documents

Questions & answers

How efficient is the Tesla 1707000-XX-Y?

The California Energy Commission lists a weighted efficiency of 96.2–97.5% for Tesla 1707000-XX-Y models, measured at six power levels and three DC voltages.

What sizes does the Tesla 1707000-XX-Y come in?

The CEC list includes 2 models from 10 kW to 11.5 kW AC: 1707000-XX-Y, 1707000-XX-Y.

Is the Tesla 1707000-XX-Y certified to UL 1741 SB?

Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.

Can the Tesla 1707000-XX-Y be used with a battery?

The CEC lists it as a dc-coupled hybrid (pv + battery). In Southern California permits it was installed with Tesla Powerwall 3 Expansion, Tesla Powerwall 3.

What is the 1707000-XX-Y’s DC input voltage range?

MPPT operating range 150–480 V. CEC tested it at 270–480 V DC.

Who installs it in Southern California?

Building permits name this series 6 times (Feb 2025 – Sep 2026). The most active licensed installers are Qcells For New Homes, Sun Capital Energy, Sunrun.

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. Tesla — manufacturer datasheet “Powerwall 3 Power Everything system behavior to meet their energy goals.”.
  3. Tesla — document library on the manufacturer’s website (links above).
  4. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  5. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
  6. California Energy Commission — PV Module List (module electrical data for the compatibility check).
  7. Building permits — City of Palmdale (Aug 2026 – Sep 2026); City of Huntington Beach (Feb 2025); Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Nov 2025). Equipment matched from permit descriptions by model number.
  8. Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.
  9. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).