Cali-GrafCali-Graf
Hybrid inverterSRNE Solar

SRNE Solar HEBP48120U240-Pro

Hybrid inverter, dc-coupled hybrid (pv + battery). 2 models, 10.4 kW–12 kW AC at 208 V / 240 V.

UL 1741 SBCEC listed · Jun 23, 2025
Model
  • Rated AC power12 kW
  • CEC weighted efficiency96.5%

Models & power ratings

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library · 2 models
ModelNominal ACGrid voltageCEC continuousRated AC (SAM)CEC weighted eff.DC test windowCEC listedUL 1741 SB
HEBP48120U240-Pro10.4 kW208 V10.4 kW10.4 kW96.5%275–450 VJun 23, 2025SB
HEBP48120U240-Pro12 kW240 V12 kW12 kW96.5%275–450 VJun 23, 2025SB
Some models are also on the CEC Battery Inverter list — one product, two listings.

DC input (PV side)

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Panel compatibility & string sizing

NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
HEBP48120U240-Pro: max DC 450 V · MPPT 275–450 V (CEC test window)

Most-permitted panels in Southern California

PanelPowerVoc coldVmp hotPanels per stringInstalled together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410410 W48.1 V30.6 V9–9—
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W48.1 V30.6 V9–9—
LONGi LR5-54HABB-400M400 W39.3 V25.3 V11–11—
JA Solar JAM54S31-405/MR405 W39.4 V25.5 V11–11—
Hyundai Solutions HiN-T440NF(BK)440 W40.9 V27 Vno fit—
Silfab Solar SIL-440QD440 W41.1 V28 V10–10—
Qcells Q.TRON BLK M-G2+ 430430 W41.3 V28 V10–10—
Qcells Q.TRON BLK M-G2.H+ 430430 W41.3 V28 V10–10—
REC Group REC460AA Pure-RX460 W68.8 V47.1 V6–6—
Elin (Sirius PV) ELNSM54M-HC-410410 W39.3 V25.3 V11–11—
Qcells Q.TRON BLK M-G2.C+ 430430 W41.3 V28 V10–10—
Tesla TSP-420420 W43.4 V27.7 V10–10—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.

Compare with similar 12 kW inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
SRNE Solar HEBP48120U240-Pro10.4 kW–12 kW96.5%275–450 VYes20250
SolarEdge SExxxxH-US3 kW–11.4 kW99.0%360–480 VYes20251,046
Delta Electronics Ex-TL-US3.33 kW–9.6 kW97.5%200–480 VYes202228
SolarEdge SExxxxxA-US3.8 kW–11.4 kW98.0%320–500 VNo202418
Growatt MIN xxxxTL-XH-US2.63 kW–11.4 kW98.0%125–480 VYes202115
Same type and grid voltage, power range covering this model; same fields from the same sources.

About SRNE Solar

CEC Grid Support Inverter List (Oct 7, 2026)

Other series

HEBP48150U320-HHEBP48160U340-HHEBP48180U380-HSEI-xxK-U3PSEI-xxK-UBPHEBP48100U240-ProHEBP48114U240-ProHEBP4880U240-ProSEI-8K-UPROSEI-xxK-UPROHESP48100U200-HHESP48120U200-H

Questions & answers

How efficient is the SRNE Solar HEBP48120U240-Pro?

The California Energy Commission lists a weighted efficiency of 96.5% for SRNE Solar HEBP48120U240-Pro models, measured at six power levels and three DC voltages.

What sizes does the SRNE Solar HEBP48120U240-Pro come in?

The CEC list includes 2 models from 10.4 kW to 12 kW AC: HEBP48120U240-Pro, HEBP48120U240-Pro.

Is the SRNE Solar HEBP48120U240-Pro certified to UL 1741 SB?

Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.

Can the SRNE Solar HEBP48120U240-Pro be used with a battery?

The CEC lists it as a dc-coupled hybrid (pv + battery).

What is the HEBP48120U240-Pro’s DC input voltage range?

CEC tested it at 275–450 V DC.

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  3. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
  4. California Energy Commission — PV Module List (module electrical data for the compatibility check).
  5. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  6. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).