SolarEdge datasheet · CEC Grid Support Inverter List (Oct 7, 2026)
InterfacesEthernet, Zigbee, RS485
Built-in production meterBuilt-in meter (CEC listing)
Size, weight & environment
SolarEdge datasheet
Enclosure ratingNEMA 3R
CoolingNatural convection (no fans)
Operating temperature−25 to +60 °C
Panel compatibility & string sizing
NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
SE3800A-US: max DC 480 V · MPPT 360–480 V (CEC test window)
Most-permitted panels in Southern California
Panel
Power
Voc cold
Vmp hot
Panels per string
Installed together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410
410 W
48.1 V
30.6 V
no fit
2
Qcells Q.PEAK DUO BLK ML-G10+ 410
410 W
48.1 V
30.6 V
no fit
—
LONGi LR5-54HABB-400M
400 W
39.3 V
25.3 V
no fit
—
JA Solar JAM54S31-405/MR
405 W
39.4 V
25.5 V
no fit
—
Hyundai Solutions HiN-T440NF(BK)
440 W
40.9 V
27 V
no fit
—
Silfab Solar SIL-440QD
440 W
41.1 V
28 V
no fit
—
Qcells Q.TRON BLK M-G2+ 430
430 W
41.3 V
28 V
no fit
—
Qcells Q.TRON BLK M-G2.H+ 430
430 W
41.3 V
28 V
no fit
—
REC Group REC460AA Pure-RX
460 W
68.8 V
47.1 V
no fit
—
Elin (Sirius PV) ELNSM54M-HC-410
410 W
39.3 V
25.3 V
no fit
—
Qcells Q.TRON BLK M-G2.C+ 430
430 W
41.3 V
28 V
no fit
—
Tesla TSP-420
420 W
43.4 V
27.7 V
no fit
—
Usually installed with power optimizers: string length follows the optimizer rules, not panel voltage — use the manufacturer’s designer.
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.
Battery & storage pairings
building permits
Batteries installed with it in SoCal
LG Energy Solution RESU 10H
5
SolarEdge Home Battery
5
LG Energy Solution (model not specified)
2
What it's installed with
building permits
Panels
LG Electronics LGxxxN1C-V5
2
Qcells Q.PEAK DUO
2
Optimizers
SolarEdge Power Optimizer
3
Batteries
LG Energy Solution RESU 10H
5
SolarEdge Home Battery
5
LG Energy Solution (model not specified)
2
Permits naming both; 15 of 18 permits list other equipment.
Installed in Southern California
building permits
18
Permits name it
Jul 2019 – Aug 2025
2
Jurisdictions so far
LA County (unincorp.) (17), Palmdale (1)
6.7 kW
Typical system
median of 10 permits
Permits over time
Model named in permit
SE3800A-US
6
SE7600A-US
5
SE11400A-US
1
SE10000A-US
1
Top ZIP codes
ZIP 910015
ZIP 935912
ZIP 911072
ZIP 917752
Other ZIP codes7
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.
CEC Grid Support Inverter List (Oct 7, 2026) · building permits
Inverter
Power
CEC weighted eff.
DC test window
UL 1741 SB
Latest CEC
SoCal permits
SolarEdge SExxxxxA-US
3.8 kW–11.4 kW
98.0%
360–480 V
—
2017
25
SolarEdge SExxxxH-US
3 kW–11.4 kW
99.0%
360–480 V
Yes
2025
1,046
Delta Electronics Ex-TL-US
3.33 kW–9.6 kW
97.5%
200–480 V
Yes
2022
28
Qcells Q.VOLT Hx.xSX
3.8 kW–7.6 kW
97.5%
175–500 V
Yes
2023
25
Growatt MIN xxxxTL-XH-US
2.63 kW–11.4 kW
98.0%
125–480 V
Yes
2021
15
Same type and grid voltage, power range covering this model; same fields from the same sources.
About SolarEdge
CEC Grid Support Inverter List (Oct 7, 2026)
ManufacturerSolarEdge
Listed in CEC asSolarEdge Technologies Ltd.
Websitesolaredge.com
Models on CEC lists135
Other series
SExxxxH-US · 1046 permitsNXxxxxT-US
Questions & answers
How efficient is the SolarEdge SExxxxxA-US?
The California Energy Commission lists a weighted efficiency of 97.0–98.0% for SolarEdge SExxxxxA-US models, measured at six power levels and three DC voltages.
What sizes does the SolarEdge SExxxxxA-US come in?
The CEC list includes 7 models from 3.8 kW to 11.4 kW AC: SE3800A-US, SE3800A-US, SE7600A-US, SE7600A-US, SE10000A-US, SE10000A-US, SE11400A-US.
Is the SolarEdge SExxxxxA-US certified to UL 1741 SB?
The CEC list does not show UL 1741 SB certification for these models.
Can the SolarEdge SExxxxxA-US be used with a battery?
The CEC lists it as a dc-coupled hybrid (pv + battery). In Southern California permits it was installed with LG Energy Solution RESU 10H, SolarEdge Home Battery, LG Energy Solution (model not specified).
What is the SE3800A-US’s DC input voltage range?
CEC tested it at 360–480 V DC.
Who installs it in Southern California?
Building permits name this series 18 times (Jul 2019 – Aug 2025). The most active licensed installers are Bright Ops.
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
SolarEdge — manufacturer datasheet “STOREDGE TM SolarEdge Single Phase StorEdgeTM Solutions for North America”.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Jul 2019 – Aug 2024); City of Palmdale (Aug 2025). Equipment matched from permit descriptions by model number.
Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.