Cali-GrafCali-Graf
Hybrid inverterSol-Ark

Sol-Ark 5K-120V/8K-230V-1P

Hybrid inverter, dc-coupled hybrid (pv + battery). 2 models, 5 kW–8 kW AC at 120 V / 240 V.

UL 1741 SBCEC listed · Nov 14, 2022
Model
  • Rated AC power8 kW
  • CEC weighted efficiency96.5%

Models & power ratings

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library · 2 models
ModelNominal ACGrid voltageCEC continuousRated AC (SAM)CEC weighted eff.DC test windowCEC listedUL 1741 SB
5K-120V/8K-230V-1P5 kW120 V4.79 kW4.79 kW96.5%200–425 VNov 14, 2022SB
5K-120V/8K-230V-1P8 kW240 V7.97 kW7.97 kW96.5%200–425 VNov 14, 2022SB
Some models are also on the CEC Battery Inverter list — one product, two listings.

DC input (PV side)

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Panel compatibility & string sizing

NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
5K-120V/8K-230V-1P: max DC 425 V · MPPT 200–425 V (CEC test window)

Most-permitted panels in Southern California

PanelPowerVoc coldVmp hotPanels per stringInstalled together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410410 W48.1 V30.6 V7–8—
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W48.1 V30.6 V7–8—
LONGi LR5-54HABB-400M400 W39.3 V25.3 V8–10—
JA Solar JAM54S31-405/MR405 W39.4 V25.5 V8–10—
Hyundai Solutions HiN-T440NF(BK)440 W40.9 V27 V8–10—
Silfab Solar SIL-440QD440 W41.1 V28 V8–10—
Qcells Q.TRON BLK M-G2+ 430430 W41.3 V28 V8–10—
Qcells Q.TRON BLK M-G2.H+ 430430 W41.3 V28 V8–10—
REC Group REC460AA Pure-RX460 W68.8 V47.1 V5–6—
Elin (Sirius PV) ELNSM54M-HC-410410 W39.3 V25.3 V8–10—
Qcells Q.TRON BLK M-G2.C+ 430430 W41.3 V28 V8–10—
Tesla TSP-420420 W43.4 V27.7 V8–9—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.

Compare with similar 8 kW inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
Sol-Ark 5K-120V/8K-230V-1P5 kW–8 kW96.5%200–425 VYes20220
SolarEdge SExxxxH-US3 kW–11.4 kW99.0%360–480 VYes20251,046
Delta Electronics Ex-TL-US3.33 kW–9.6 kW97.5%200–480 VYes202228
Qcells Q.VOLT Hx.xSX3.8 kW–7.6 kW97.5%175–500 VYes202325
SolarEdge SExxxxxA-US3.8 kW–11.4 kW98.0%320–500 VNo202418
Same type and grid voltage, power range covering this model; same fields from the same sources.

About Sol-Ark

CEC Grid Support Inverter List (Oct 7, 2026)

Other series

12K-2P-LLLimitless 18K-2P-LVLimitless xxK-LVxxK-3P-480VxxK-3P-208V

Questions & answers

How efficient is the Sol-Ark 5K-120V/8K-230V-1P?

The California Energy Commission lists a weighted efficiency of 96.5% for Sol-Ark 5K-120V/8K-230V-1P models, measured at six power levels and three DC voltages.

What sizes does the Sol-Ark 5K-120V/8K-230V-1P come in?

The CEC list includes 2 models from 5 kW to 8 kW AC: 5K-120V/8K-230V-1P, 5K-120V/8K-230V-1P.

Is the Sol-Ark 5K-120V/8K-230V-1P certified to UL 1741 SB?

Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.

Can the Sol-Ark 5K-120V/8K-230V-1P be used with a battery?

The CEC lists it as a dc-coupled hybrid (pv + battery).

What is the 5K-120V/8K-230V-1P’s DC input voltage range?

CEC tested it at 200–425 V DC.

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  3. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
  4. California Energy Commission — PV Module List (module electrical data for the compatibility check).
  5. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  6. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).