Siemens Industry blueplanet155 TL3 GEN2 M1 WM OD USP0
String inverter. 1 model, 155 kW AC at 600 V.
UL 1741 SBCEC listed · Jun 2, 2025
Rated AC power155 kW
CEC weighted efficiency98.5%
DC input (PV side)
CEC Grid Support Inverter List (Oct 7, 2026)
CEC test DC voltages (min / nom / max)875 / 1,000 / 1,300 V
AC output (grid side)
CEC Grid Support Inverter List (Oct 7, 2026)
Rated AC power155 kW
CEC-measured continuous output155.9 kW
Grid voltage600 V
Phase3-phase 600 V
Efficiency
CEC Grid Support Inverter List (Oct 7, 2026)
CEC weighted efficiency98.5%
Night-time standby (tare)5.27 W
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.
Grid & smart-inverter certification
CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB (3rd ed.)Yes — Bureau Veritas Consumer Products Services, certificate Sep 10, 2024
UL 1741 SA (SA8–SA13)Yes — Bureau Veritas Consumer Products Services
Firmware tested (SA)V4.05
Volt-VAr with reactive power priority (SA13)Yes
Freq-Watt / Volt-Watt (SA14–15)Yes
Disable permit service / limit active power (SA17–18)Yes
CSIP (IEEE 2030.5) conformanceNo
Monitor key data & scheduling (Rule 21 Phase 3)No
CEC listedJun 2, 2025
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.
Panel compatibility & string sizing
CEC Grid Support Inverter List (Oct 7, 2026) · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
blueplanet155 TL3 GEN2 M1 WM OD USP0: max DC 1,300 V · MPPT 875–1,300 V (CEC test window)
Most-permitted panels in Southern California
Panel
Power
Voc cold
Vmp hot
Panels per string
Installed together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410
410 W
48.1 V
30.6 V
no fit
—
Qcells Q.PEAK DUO BLK ML-G10+ 410
410 W
48.1 V
30.6 V
no fit
—
LONGi LR5-54HABB-400M
400 W
39.3 V
25.3 V
no fit
—
JA Solar JAM54S31-405/MR
405 W
39.4 V
25.5 V
no fit
—
Hyundai Solutions HiN-T440NF(BK)
440 W
40.9 V
27 V
no fit
—
Silfab Solar SIL-440QD
440 W
41.1 V
28 V
no fit
—
Qcells Q.TRON BLK M-G2+ 430
430 W
41.3 V
28 V
no fit
—
Qcells Q.TRON BLK M-G2.H+ 430
430 W
41.3 V
28 V
no fit
—
REC Group REC460AA Pure-RX
460 W
68.8 V
47.1 V
no fit
—
Elin (Sirius PV) ELNSM54M-HC-410
410 W
39.3 V
25.3 V
no fit
—
Qcells Q.TRON BLK M-G2.C+ 430
430 W
41.3 V
28 V
no fit
—
Tesla TSP-420
420 W
43.4 V
27.7 V
no fit
—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.
Compare with similar 155 kW inverters
CEC Grid Support Inverter List (Oct 7, 2026) · building permits
Inverter
Power
CEC weighted eff.
DC test window
UL 1741 SB
Latest CEC
SoCal permits
Siemens Industry blueplanetxxx TL3 GEN2 M1 WM OD USP0
155 kW–155 kW
98.5%
875–1,300 V
Yes
2025
0
SolarEdge SExKUS
9 kW–330 kW
99.0%
100–1,400 V
16 of 19
2025
14
SMA SHP FLEX-US-21
55 kW–172 kW
99.0%
372–1,200 V
Yes
2025
—
Same type and grid voltage, power range covering this model; same fields from the same sources.
About Siemens Industry
CEC Grid Support Inverter List (Oct 7, 2026)
ManufacturerSiemens Industry
Listed in CEC asSiemens Industry, Inc.
Models on CEC lists11
Other series
blueplanetxxx TL3 GEN2 M1 WM OD USPX
Questions & answers
How efficient is the Siemens Industry blueplanetxxx TL3 GEN2 M1 WM OD USP0?
The California Energy Commission lists a weighted efficiency of 98.5% for Siemens Industry blueplanetxxx TL3 GEN2 M1 WM OD USP0 models, measured at six power levels and three DC voltages.
Is the Siemens Industry blueplanetxxx TL3 GEN2 M1 WM OD USP0 certified to UL 1741 SB?
Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.
What is the blueplanet155 TL3 GEN2 M1 WM OD USP0’s DC input voltage range?
CEC tested it at 875–1,300 V DC.
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Southern California permit portals. Equipment matched from permit descriptions.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate