Cali-GrafCali-Graf
Hybrid inverterShenzhen Kstar New Energy

Shenzhen Kstar New Energy E12KD

Hybrid inverter, dc-coupled hybrid (pv + battery). 4 models, 8 kW–15 kW AC at 240 V.

UL 1741 SBCEC listed · Dec 11, 2024
Model
  • Rated AC power12 kW
  • CEC weighted efficiency97.0%

Models & power ratings

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library · 4 models
ModelNominal ACGrid voltageCEC continuousRated AC (SAM)CEC weighted eff.DC test windowCEC listedUL 1741 SB
E8KD8 kW240 V8.02 kW8.02 kW97.5%200–400 VDec 11, 2024SB
E10KD10 kW240 V10 kW10 kW97.5%240–400 VDec 11, 2024SB
E12KD12 kW240 V12 kW12 kW97.0%200–400 VDec 11, 2024SB
E15KD15 kW240 V15 kW15 kW97.0%240–400 VDec 11, 2024SB
Some models are also on the CEC Battery Inverter list — one product, two listings.

DC input (PV side)

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Panel compatibility & string sizing

NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
E12KD: max DC 400 V · MPPT 200–400 V (CEC test window)

Most-permitted panels in Southern California

PanelPowerVoc coldVmp hotPanels per stringInstalled together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410410 W48.1 V30.6 V7–8—
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W48.1 V30.6 V7–8—
LONGi LR5-54HABB-400M400 W39.3 V25.3 V8–10—
JA Solar JAM54S31-405/MR405 W39.4 V25.5 V8–10—
Hyundai Solutions HiN-T440NF(BK)440 W40.9 V27 V8–9—
Silfab Solar SIL-440QD440 W41.1 V28 V8–9—
Qcells Q.TRON BLK M-G2+ 430430 W41.3 V28 V8–9—
Qcells Q.TRON BLK M-G2.H+ 430430 W41.3 V28 V8–9—
REC Group REC460AA Pure-RX460 W68.8 V47.1 V5–5—
Elin (Sirius PV) ELNSM54M-HC-410410 W39.3 V25.3 V8–10—
Qcells Q.TRON BLK M-G2.C+ 430430 W41.3 V28 V8–9—
Tesla TSP-420420 W43.4 V27.7 V8–9—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.

Compare with similar 12 kW inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
Shenzhen Kstar New Energy ExxKD8 kW–15 kW97.0%200–400 VYes20240
SolarEdge SExxxxH-US3 kW–11.4 kW99.0%360–480 VYes20251,046
Delta Electronics Ex-TL-US3.33 kW–9.6 kW97.5%200–480 VYes202228
SolarEdge SExxxxxA-US3.8 kW–11.4 kW98.0%320–500 VNo202418
Growatt MIN xxxxTL-XH-US2.63 kW–11.4 kW98.0%125–480 VYes202115
Same type and grid voltage, power range covering this model; same fields from the same sources.

Questions & answers

How efficient is the Shenzhen Kstar New Energy ExxKD?

The California Energy Commission lists a weighted efficiency of 97.0–97.5% for Shenzhen Kstar New Energy ExxKD models, measured at six power levels and three DC voltages.

What sizes does the Shenzhen Kstar New Energy ExxKD come in?

The CEC list includes 4 models from 8 kW to 15 kW AC: E8KD, E10KD, E12KD, E15KD.

Is the Shenzhen Kstar New Energy ExxKD certified to UL 1741 SB?

Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.

Can the Shenzhen Kstar New Energy ExxKD be used with a battery?

The CEC lists it as a dc-coupled hybrid (pv + battery).

What is the E12KD’s DC input voltage range?

CEC tested it at 200–400 V DC.

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  3. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
  4. California Energy Commission — PV Module List (module electrical data for the compatibility check).
  5. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  6. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).