Cali-GrafCali-Graf
Hybrid inverterSchneider Electric

Schneider Electric HY8K1NA1

Hybrid inverter, dc-coupled hybrid (pv + battery). 1 model, 7.68 kW AC at 240 V.

UL 1741 SBCEC listed · Oct 11, 2023Rapid shutdown
  • Rated AC power7.68 kW
  • CEC weighted efficiency97.0%
  • Warranty10 years

DC input (PV side)

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

AC output (grid side)

CEC Grid Support Inverter List (Oct 7, 2026)

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026) · Schneider Electric datasheet
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Safety & protection

Schneider Electric datasheet

Monitoring & communication

Schneider Electric datasheet

Size, weight & environment

Schneider Electric datasheet

Warranty

Schneider Electric datasheet

Panel compatibility & string sizing

NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
HY8K1NA1: max DC 480 V · MPPT 200–480 V (CEC test window)

Most-permitted panels in Southern California

PanelPowerVoc coldVmp hotPanels per stringInstalled together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410410 W48.1 V30.6 V7–9—
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W48.1 V30.6 V7–9—
LONGi LR5-54HABB-400M400 W39.3 V25.3 V8–12—
JA Solar JAM54S31-405/MR405 W39.4 V25.5 V8–12—
Hyundai Solutions HiN-T440NF(BK)440 W40.9 V27 V8–11—
Silfab Solar SIL-440QD440 W41.1 V28 V8–11—
Qcells Q.TRON BLK M-G2+ 430430 W41.3 V28 V8–11—
Qcells Q.TRON BLK M-G2.H+ 430430 W41.3 V28 V8–11—
REC Group REC460AA Pure-RX460 W68.8 V47.1 V5–6—
Elin (Sirius PV) ELNSM54M-HC-410410 W39.3 V25.3 V8–12—
Qcells Q.TRON BLK M-G2.C+ 430430 W41.3 V28 V8–11—
Tesla TSP-420420 W43.4 V27.7 V8–11—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.

Compare with similar 7.68 kW inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
Schneider Electric HYxK1NA17.68 kW–7.68 kW97.0%200–480 VYes20230
SolarEdge SExxxxH-US3 kW–11.4 kW99.0%360–480 VYes20251,046
Delta Electronics Ex-TL-US3.33 kW–9.6 kW97.5%200–480 VYes202228
Qcells Q.VOLT Hx.xSX3.8 kW–7.6 kW97.5%175–500 VYes202325
SolarEdge SExxxxxA-US3.8 kW–11.4 kW98.0%320–500 VNo202418
Same type and grid voltage, power range covering this model; same fields from the same sources.

About Schneider Electric

CEC Grid Support Inverter List (Oct 7, 2026)

Questions & answers

How efficient is the Schneider Electric HYxK1NA1?

The California Energy Commission lists a weighted efficiency of 97.0% for Schneider Electric HYxK1NA1 models, measured at six power levels and three DC voltages.

Is the Schneider Electric HYxK1NA1 certified to UL 1741 SB?

Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.

Can the Schneider Electric HYxK1NA1 be used with a battery?

The CEC lists it as a dc-coupled hybrid (pv + battery).

What is the HY8K1NA1’s DC input voltage range?

CEC tested it at 200–480 V DC.

What warranty does it have?

10 years standard (manufacturer datasheet).

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. Schneider Electric — manufacturer datasheet “Schneider Inverter For United States Flexible and Efficient Solar Schneider Home”.
  3. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  4. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
  5. California Energy Commission — PV Module List (module electrical data for the compatibility check).
  6. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  7. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).