Hybrid inverter, dc-coupled hybrid (pv + battery). 1 model, 5 kW AC at 240 V.
UL 1741 SBCEC listed · Jun 1, 2023
Rated AC power5 kW
CEC weighted efficiency97.0%
DC input (PV side)
CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC test DC voltages (min / nom / max)180 / 360 / 430 V
DC input at rated output (CEC test)5.25 kW
AC output (grid side)
CEC Grid Support Inverter List (Oct 7, 2026)
Rated AC power5 kW
CEC-measured continuous output5.09 kW
Grid voltage240 V
Phasesplit-phase 120/240 V
Efficiency
CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency97.0%
Night-time standby (tare)22.6 W
Power to start converting29.4 W
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.
Grid & smart-inverter certification
CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB (3rd ed.)Yes — SGS, certificate Oct 9, 2023
UL 1741 SA (SA8–SA13)Yes — SGS
Volt-VAr with reactive power priority (SA13)Yes
Freq-Watt / Volt-Watt (SA14–15)Yes
Disable permit service / limit active power (SA17–18)Yes
CSIP (IEEE 2030.5) conformanceYes — SGS, Oct 20, 2023
Monitor key data & scheduling (Rule 21 Phase 3)Yes (attested Oct 30, 2023)
Power control system (PCS)Stated in CEC listing (power control system)
CEC listedJun 1, 2023
Last CEC updateSep 3, 2024
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.
Panel compatibility & string sizing
NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
RIV4850HI-SPS: max DC 430 V · MPPT 180–430 V (CEC test window)
Most-permitted panels in Southern California
Panel
Power
Voc cold
Vmp hot
Panels per string
Installed together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410
410 W
48.1 V
30.6 V
6–8
—
Qcells Q.PEAK DUO BLK ML-G10+ 410
410 W
48.1 V
30.6 V
6–8
—
LONGi LR5-54HABB-400M
400 W
39.3 V
25.3 V
8–10
—
JA Solar JAM54S31-405/MR
405 W
39.4 V
25.5 V
8–10
—
Hyundai Solutions HiN-T440NF(BK)
440 W
40.9 V
27 V
7–10
—
Silfab Solar SIL-440QD
440 W
41.1 V
28 V
7–10
—
Qcells Q.TRON BLK M-G2+ 430
430 W
41.3 V
28 V
7–10
—
Qcells Q.TRON BLK M-G2.H+ 430
430 W
41.3 V
28 V
7–10
—
REC Group REC460AA Pure-RX
460 W
68.8 V
47.1 V
4–6
—
Elin (Sirius PV) ELNSM54M-HC-410
410 W
39.3 V
25.3 V
8–10
—
Qcells Q.TRON BLK M-G2.C+ 430
430 W
41.3 V
28 V
7–10
—
Tesla TSP-420
420 W
43.4 V
27.7 V
7–9
—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.
Compare with similar 5 kW inverters
CEC Grid Support Inverter List (Oct 7, 2026) · building permits
Inverter
Power
CEC weighted eff.
DC test window
UL 1741 SB
Latest CEC
SoCal permits
RNG International RIVxxxxHI-SPS
5 kW–5 kW
97.0%
180–430 V
Yes
2023
0
SolarEdge SExxxxH-US
3 kW–11.4 kW
99.0%
360–480 V
Yes
2025
1,046
Delta Electronics Ex-TL-US
3.33 kW–9.6 kW
97.5%
200–480 V
Yes
2022
28
Qcells Q.VOLT Hx.xSX
3.8 kW–7.6 kW
97.5%
175–500 V
Yes
2023
25
SolarEdge SExxxxxA-US
3.8 kW–11.4 kW
98.0%
320–500 V
No
2024
18
Same type and grid voltage, power range covering this model; same fields from the same sources.
Questions & answers
How efficient is the RNG International RIVxxxxHI-SPS?
The California Energy Commission lists a weighted efficiency of 97.0% for RNG International RIVxxxxHI-SPS models, measured at six power levels and three DC voltages.
Is the RNG International RIVxxxxHI-SPS certified to UL 1741 SB?
Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.
Can the RNG International RIVxxxxHI-SPS be used with a battery?
The CEC lists it as a dc-coupled hybrid (pv + battery).
What is the RIV4850HI-SPS’s DC input voltage range?
CEC tested it at 180–430 V DC.
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Southern California permit portals. Equipment matched from permit descriptions.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.