Cali-GrafCali-Graf
Hybrid inverterMidNite Solar

MidNite Solar MN 15-12KW-AIO

Hybrid inverter, dc-coupled hybrid (pv + battery). 3 models, 10.1 kW–15 kW AC at 208 V / 240 V.

UL 1741 SBCEC listed · Jul 11, 2024
Model
  • Rated AC power15 kW
  • CEC weighted efficiency96.6%

Models & power ratings

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library · 3 models
ModelNominal ACGrid voltageCEC continuousRated AC (SAM)CEC weighted eff.DC test windowCEC listedUL 1741 SB
MN 15-12KW-AIO10.1 kW240 V10.1 kW10.1 kW96.5%200–480 VDec 22, 2025SB
MN 15-12KW-AIO10.2 kW208 V10.2 kW10.2 kW96.5%200–480 VDec 22, 2025SB
MN 15-12KW-AIO15 kW240 V10.1 kW10.1 kW96.6%200–480 VJul 11, 2024SB
Some models are also on the CEC Battery Inverter list — one product, two listings.

DC input (PV side)

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Panel compatibility & string sizing

NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
MN 15-12KW-AIO: max DC 480 V · MPPT 200–480 V (CEC test window)

Most-permitted panels in Southern California

PanelPowerVoc coldVmp hotPanels per stringInstalled together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410410 W48.1 V30.6 V7–9—
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W48.1 V30.6 V7–9—
LONGi LR5-54HABB-400M400 W39.3 V25.3 V8–12—
JA Solar JAM54S31-405/MR405 W39.4 V25.5 V8–12—
Hyundai Solutions HiN-T440NF(BK)440 W40.9 V27 V8–11—
Silfab Solar SIL-440QD440 W41.1 V28 V8–11—
Qcells Q.TRON BLK M-G2+ 430430 W41.3 V28 V8–11—
Qcells Q.TRON BLK M-G2.H+ 430430 W41.3 V28 V8–11—
REC Group REC460AA Pure-RX460 W68.8 V47.1 V5–6—
Elin (Sirius PV) ELNSM54M-HC-410410 W39.3 V25.3 V8–12—
Qcells Q.TRON BLK M-G2.C+ 430430 W41.3 V28 V8–11—
Tesla TSP-420420 W43.4 V27.7 V8–11—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.

Compare with similar 15 kW inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
MidNite Solar MN 15-12KW-AIO10.1 kW–15 kW96.6%200–480 VYes20250
EG4 Electronics 18KPV-12LV10.4 kW–12 kW97.0%230–480 VYes20237
Shenzhen Lux Power Technology LXP-LB-US xK8 kW–16 kW97.0%210–480 VYes20251
Sol-Ark 12K-2P-LL12 kW–12 kW97.5%250–425 VYes2026—
Suzhou Ample ESS AP-LxK-SPUS7.98 kW–15 kW96.5%108–480 VYes2026—
Same type and grid voltage, power range covering this model; same fields from the same sources.

Questions & answers

How efficient is the MidNite Solar MN 15-12KW-AIO?

The California Energy Commission lists a weighted efficiency of 96.5–96.6% for MidNite Solar MN 15-12KW-AIO models, measured at six power levels and three DC voltages.

What sizes does the MidNite Solar MN 15-12KW-AIO come in?

The CEC list includes 3 models from 10.1 kW to 15 kW AC: MN 15-12KW-AIO, MN 15-12KW-AIO, MN 15-12KW-AIO.

Is the MidNite Solar MN 15-12KW-AIO certified to UL 1741 SB?

Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.

Can the MidNite Solar MN 15-12KW-AIO be used with a battery?

The CEC lists it as a dc-coupled hybrid (pv + battery).

What is the MN 15-12KW-AIO’s DC input voltage range?

CEC tested it at 200–480 V DC.

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  3. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
  4. California Energy Commission — PV Module List (module electrical data for the compatibility check).
  5. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  6. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).