KACO new energy KACO blueplanet 110 TL3 M1 WM OD IIK0
String inverter. 1 model, 110 kW AC at 480 V.
CEC listed · Feb 11, 2020
Rated AC power110 kW
CEC weighted efficiency98.5%
DC input (PV side)
CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC test DC voltages (min / nom / max)705 / 854 / 1,300 V
DC input at rated output (CEC test)111.5 kW
AC output (grid side)
CEC Grid Support Inverter List (Oct 7, 2026)
Rated AC power110 kW
CEC-measured continuous output109.8 kW
Grid voltage480 V
Phase3-phase 480 V
Efficiency
CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency98.5%
Night-time standby (tare)5 W
Power to start converting88.7 W
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.
Grid & smart-inverter certification
CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB (3rd ed.)No
UL 1741 SA (SA8–SA13)Yes — Intertek
Volt-VAr with reactive power priority (SA13)Yes
Freq-Watt / Volt-Watt (SA14–15)Yes
Disable permit service / limit active power (SA17–18)No
CSIP (IEEE 2030.5) conformanceNo
Monitor key data & scheduling (Rule 21 Phase 3)No
CEC listedFeb 11, 2020
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.
Panel compatibility & string sizing
NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
KACO blueplanet 110 TL3 M1 WM OD IIK0: max DC 1,300 V · MPPT 705–1,300 V (CEC test window)
Most-permitted panels in Southern California
Panel
Power
Voc cold
Vmp hot
Panels per string
Installed together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410
410 W
48.1 V
30.6 V
24–27
—
Qcells Q.PEAK DUO BLK ML-G10+ 410
410 W
48.1 V
30.6 V
24–27
—
LONGi LR5-54HABB-400M
400 W
39.3 V
25.3 V
28–33
—
JA Solar JAM54S31-405/MR
405 W
39.4 V
25.5 V
28–32
—
Hyundai Solutions HiN-T440NF(BK)
440 W
40.9 V
27 V
27–31
—
Silfab Solar SIL-440QD
440 W
41.1 V
28 V
26–31
—
Qcells Q.TRON BLK M-G2+ 430
430 W
41.3 V
28 V
26–31
—
Qcells Q.TRON BLK M-G2.H+ 430
430 W
41.3 V
28 V
26–31
—
REC Group REC460AA Pure-RX
460 W
68.8 V
47.1 V
15–18
—
Elin (Sirius PV) ELNSM54M-HC-410
410 W
39.3 V
25.3 V
28–33
—
Qcells Q.TRON BLK M-G2.C+ 430
430 W
41.3 V
28 V
26–31
—
Tesla TSP-420
420 W
43.4 V
27.7 V
26–29
—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.
Compare with similar 110 kW inverters
CEC Grid Support Inverter List (Oct 7, 2026) · building permits
Inverter
Power
CEC weighted eff.
DC test window
UL 1741 SB
Latest CEC
SoCal permits
KACO new energy KACO blueplanet xxx TL3 M1 WM OD IIK0
110 kW–110 kW
98.5%
705–1,300 V
—
2020
0
SolarEdge SExKUS
9 kW–330 kW
99.0%
100–1,400 V
16 of 19
2025
14
Solis (Ginlong Technologies) Solis-xxK-5G-US
75 kW–100 kW
98.5%
550–850 V
No
2020
3
Yaskawa Solectria Solar PVI xxTL-480
36 kW–100 kW
98.5%
340–850 V
3 of 4
2025
—
CPS (Chint Power Systems) SCAxxxK-T-US-480
100 kW–100 kW
98.0%
340–850 V
Yes
2025
—
Same type and grid voltage, power range covering this model; same fields from the same sources.
About KACO new energy
CEC Grid Support Inverter List (Oct 7, 2026)
ManufacturerKACO new energy
Listed in CEC asKACO new energy GmbH
Models on CEC lists13
Other series
KACO blueplanet xxx TL3 M1 WM OD IIKXKACO blueplanet xxx TL3 M1 WM OD IIP0KACO blueplanet xxx TL3 M1 WM OD IIPXKACO blueplanet xxx TL3 M1 WM OD IIQ0KACO blueplanet xxx TL3 M1 WM OD IIQX
Questions & answers
How efficient is the KACO new energy KACO blueplanet xxx TL3 M1 WM OD IIK0?
The California Energy Commission lists a weighted efficiency of 98.5% for KACO new energy KACO blueplanet xxx TL3 M1 WM OD IIK0 models, measured at six power levels and three DC voltages.
Is the KACO new energy KACO blueplanet xxx TL3 M1 WM OD IIK0 certified to UL 1741 SB?
The CEC list does not show UL 1741 SB certification for these models.
What is the KACO blueplanet 110 TL3 M1 WM OD IIK0’s DC input voltage range?
CEC tested it at 705–1,300 V DC.
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Southern California permit portals. Equipment matched from permit descriptions.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.