Disable permit service / limit active power (SA17–18)Yes
CSIP (IEEE 2030.5) conformanceVia gateway during testing (Y*)
Monitor key data & scheduling (Rule 21 Phase 3)Yes (attested Jun 1, 2022)
Power control system (PCS)Stated in CEC listing (power control system)
Built-in meterYes
CEC listedAug 1, 2018
Last CEC updateApr 2, 2024
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.
Monitoring & communication
CEC Grid Support Inverter List (Oct 7, 2026)
Built-in production meterBuilt-in meter (CEC listing)
Panel compatibility & string sizing
NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
E6-TL-US: max DC 480 V · MPPT 200–480 V (CEC test window)
Most-permitted panels in Southern California
Panel
Power
Voc cold
Vmp hot
Panels per string
Installed together
JA Solar JAM54S31-405/MR
405 W
39.4 V
25.5 V
8–12
15
Qcells Q.PEAK DUO BLK ML-G10.C+ 410
410 W
48.1 V
30.6 V
7–9
—
Qcells Q.PEAK DUO BLK ML-G10+ 410
410 W
48.1 V
30.6 V
7–9
—
LONGi LR5-54HABB-400M
400 W
39.3 V
25.3 V
8–12
—
Hyundai Solutions HiN-T440NF(BK)
440 W
40.9 V
27 V
8–11
—
Silfab Solar SIL-440QD
440 W
41.1 V
28 V
8–11
—
Qcells Q.TRON BLK M-G2+ 430
430 W
41.3 V
28 V
8–11
—
Qcells Q.TRON BLK M-G2.H+ 430
430 W
41.3 V
28 V
8–11
—
REC Group REC460AA Pure-RX
460 W
68.8 V
47.1 V
5–6
—
Elin (Sirius PV) ELNSM54M-HC-410
410 W
39.3 V
25.3 V
8–12
—
Qcells Q.TRON BLK M-G2.C+ 430
430 W
41.3 V
28 V
8–11
—
Tesla TSP-420
420 W
43.4 V
27.7 V
8–11
—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.
Battery & storage pairings
building permits
Batteries installed with it in SoCal
Tesla Powerwall
6
LG Energy Solution RESU 10H Prime
5
LG Energy Solution RESU 10H
4
What it's installed with
building permits
Panels
JA Solar JAM54S31-xxx/MR
15
LONGi Hi-MO 4
4
LONGi Hi-MO 6
4
Batteries
Tesla Powerwall
6
LG Energy Solution RESU 10H Prime
5
LG Energy Solution RESU 10H
4
Gateways & interfaces
Tesla Backup Gateway
5
SnapNrack (model not specified)
2
Permits naming both; 24 of 28 permits list other equipment.
Installed in Southern California
building permits
28
Permits name it
Feb 2021 – Sep 2024
3
Jurisdictions so far
LA County (unincorp.) (26), Huntington Beach (1), Palmdale (1)
6.3 kW
Typical system
median of 25 permits
Permits over time
Model named in permit
E6-TL-US
13
E4-TL-US
11
E10-TL-US
4
Top ZIP codes
ZIP 913845
ZIP 910014
ZIP 902903
ZIP 906043
ZIP 913812
ZIP 912142
Other ZIP codes8
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.
CEC Grid Support Inverter List (Oct 7, 2026) · building permits
Inverter
Power
CEC weighted eff.
DC test window
UL 1741 SB
Latest CEC
SoCal permits
Delta Electronics Ex-TL-US
3.33 kW–9.6 kW
97.5%
200–480 V
Yes
2022
56
SolarEdge SExxxxH-US
3 kW–11.4 kW
99.0%
360–480 V
Yes
2025
1,046
Qcells Q.VOLT Hx.xSX
3.8 kW–7.6 kW
97.5%
175–500 V
Yes
2023
25
SolarEdge SExxxxxA-US
3.8 kW–11.4 kW
98.0%
320–500 V
No
2024
18
Growatt MIN xxxxTL-XH-US
2.63 kW–11.4 kW
98.0%
125–480 V
Yes
2021
15
Same type and grid voltage, power range covering this model; same fields from the same sources.
About Delta Electronics
CEC Grid Support Inverter List (Oct 7, 2026)
ManufacturerDelta Electronics
Listed in CEC asDelta Electronics
Websitedelta-americas.com
Models on CEC lists138
Other series
S12_BDIE8 Plus-TL-USEx_BDI
Questions & answers
How efficient is the Delta Electronics Ex-TL-US?
The California Energy Commission lists a weighted efficiency of 97.0–97.5% for Delta Electronics Ex-TL-US models, measured at six power levels and three DC voltages.
What sizes does the Delta Electronics Ex-TL-US come in?
The CEC list includes 8 models from 3.33 kW to 9.6 kW AC: E4-TL-US, E4-TL-US, E6-TL-US, E6-TL-US, E8-TL-US, E8-TL-US, E10-TL-US, E10-TL-US.
Is the Delta Electronics Ex-TL-US certified to UL 1741 SB?
Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.
Can the Delta Electronics Ex-TL-US be used with a battery?
The CEC lists it as a dc-coupled hybrid (pv + battery). In Southern California permits it was installed with Tesla Powerwall, LG Energy Solution RESU 10H Prime, LG Energy Solution RESU 10H.
What is the E6-TL-US’s DC input voltage range?
CEC tested it at 200–480 V DC.
Who installs it in Southern California?
Building permits name this series 28 times (Feb 2021 – Sep 2024). The most active licensed installers are Sunrun.
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Feb 2021 – Sep 2024); City of Huntington Beach (Jun 2024); City of Palmdale (Jan 2024). Equipment matched from permit descriptions by model number.
Contractors State License Board — License Master (contractor names and license status), as of Oct 5, 2026.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.