CPS (Chint Power Systems) datasheet · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
CPS SCA25KTL-DO-R/US-480: max DC 1,000 V · MPPT 560–850 V (datasheet)
Most-permitted panels in Southern California
Panel
Power
Voc cold
Vmp hot
Panels per string
Installed together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410
410 W
48.1 V
30.6 V
19–20
—
Qcells Q.PEAK DUO BLK ML-G10+ 410
410 W
48.1 V
30.6 V
19–20
—
LONGi LR5-54HABB-400M
400 W
39.3 V
25.3 V
23–25
—
JA Solar JAM54S31-405/MR
405 W
39.4 V
25.5 V
22–25
—
Hyundai Solutions HiN-T440NF(BK)
440 W
40.9 V
27 V
21–24
—
Silfab Solar SIL-440QD
440 W
41.1 V
28 V
21–24
—
Qcells Q.TRON BLK M-G2+ 430
430 W
41.3 V
28 V
21–24
—
Qcells Q.TRON BLK M-G2.H+ 430
430 W
41.3 V
28 V
21–24
—
REC Group REC460AA Pure-RX
460 W
68.8 V
47.1 V
12–14
—
Elin (Sirius PV) ELNSM54M-HC-410
410 W
39.3 V
25.3 V
23–25
—
Qcells Q.TRON BLK M-G2.C+ 430
430 W
41.3 V
28 V
21–24
—
Tesla TSP-420
420 W
43.4 V
27.7 V
21–23
—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.
Installed in Southern California
building permits
1
Permits name it
Dec 2024
1
Jurisdictions so far
LA County (unincorp.) (1)
82.4 kW
Typical system
median of 1 permits
Model named in permit
CPS SCA25KTL-DO-R/US-480
1
Only installer and ZIP level is shown — no homeowner names, street addresses or permit numbers. Permits from LA County (unincorp.) come without a contractor license, so they count toward totals but not toward installers. Counts grow as more permit portals are loaded.
Compare with similar 25 kW inverters
CEC Grid Support Inverter List (Oct 7, 2026) · building permits
Inverter
Power
CEC weighted eff.
DC test window
UL 1741 SB
Latest CEC
SoCal permits
CPS (Chint Power Systems) CPS SCAxxKTL-DO-R/US-480
20 kW–25 kW
98.0%
560–850 V
Yes
2020
1
SolarEdge SExKUS
9 kW–330 kW
99.0%
100–1,400 V
16 of 19
2025
14
SMA STP xx-US-80
27.5 kW–70 kW
97.5%
300–850 V
Yes
2026
—
SMA STP xx-US-50
13 kW–30 kW
98.0%
230–800 V
Yes
2025
—
Canadian Solar CSI-xxK-T480GL03-U
25 kW–100 kW
98.5%
550–850 V
Yes
2024
—
Same type and grid voltage, power range covering this model; same fields from the same sources.
How efficient is the CPS (Chint Power Systems) CPS SCAxxKTL-DO-R/US-480?
The California Energy Commission lists a weighted efficiency of 98.0% for CPS (Chint Power Systems) CPS SCAxxKTL-DO-R/US-480 models, measured at six power levels and three DC voltages. The datasheet states a peak efficiency of 98.5%.
What sizes does the CPS (Chint Power Systems) CPS SCAxxKTL-DO-R/US-480 come in?
The CEC list includes 2 models from 20 kW to 25 kW AC: CPS SCA20KTL-DO-R/US-480, CPS SCA25KTL-DO-R/US-480.
Is the CPS (Chint Power Systems) CPS SCAxxKTL-DO-R/US-480 certified to UL 1741 SB?
Yes — the CEC Grid Support Inverter List shows UL 1741 SB for all models.
What is the CPS SCA25KTL-DO-R/US-480’s DC input voltage range?
Max DC input voltage is 1,000 V per the datasheet. MPPT operating range 560–850 V. CEC tested it at 560–850 V DC.
What warranty does it have?
10 years standard (manufacturer datasheet).
Sources
California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
CPS (Chint Power Systems) — manufacturer datasheet “25kW, 1000Vdc String Inverters for North America The 25kW CPS three phase string inverter is designed for rooftop and”.
NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
California Energy Commission — PV Module List (module electrical data for the compatibility check).
Building permits — Los Angeles County Public Works (EPIC-LA, unincorporated areas) (Dec 2024). Equipment matched from permit descriptions by model number.
Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).
Get your free estimate
Three fields, and Cali Energy calls back within 30 minutes during business hours.
Thanks!
We got your request and will call back within 30 minutes during business hours.