String inverterABB

ABB UNO-DM-5.0-TL-PLUS-US-SZ-RA-U

String inverter. 2 models, 5 kW AC at 208 V / 240 V.

CEC listed · Aug 21, 2020Rapid shutdown
Model
  • Rated AC power5 kW
  • CEC weighted efficiency96.5%

Models & power ratings

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library · 2 models
ModelNominal ACGrid voltageCEC continuousRated AC (SAM)CEC weighted eff.DC test windowCEC listedUL 1741 SB
UNO-DM-5.0-TL-PLUS-US-SZ-RA-U5 kW208 V4.6 kW4.6 kW96.5%240–480 VAug 21, 2020—
UNO-DM-5.0-TL-PLUS-US-SZ-RA-U5 kW240 V5 kW5 kW96.5%200–480 VAug 21, 2020—

DC input (PV side)

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library

Efficiency

CEC Grid Support Inverter List (Oct 7, 2026) · NLR SAM inverter library
CEC weighted efficiency is measured by an accredited lab at six power levels and three DC voltages — the number to compare between inverters.

Grid & smart-inverter certification

CEC Grid Support Inverter List (Oct 7, 2026)
UL 1741 SB is required for new interconnections in California (Rule 21) since 2026.

Safety & protection

CEC Grid Support Inverter List (Oct 7, 2026)

Monitoring & communication

CEC Grid Support Inverter List (Oct 7, 2026)

Panel compatibility & string sizing

NLR SAM inverter library · NLR PVWatts v8 · CEC PV Module List · Cali-Graf calculation
UNO-DM-5.0-TL-PLUS-US-SZ-RA-U: max DC 480 V · MPPT 200–480 V (CEC test window)

Most-permitted panels in Southern California

PanelPowerVoc coldVmp hotPanels per stringInstalled together
Qcells Q.PEAK DUO BLK ML-G10.C+ 410410 W48.1 V30.6 V7–9—
Qcells Q.PEAK DUO BLK ML-G10+ 410410 W48.1 V30.6 V7–9—
LONGi LR5-54HABB-400M400 W39.3 V25.3 V8–12—
JA Solar JAM54S31-405/MR405 W39.4 V25.5 V8–12—
Hyundai Solutions HiN-T440NF(BK)440 W40.9 V27 V8–11—
Silfab Solar SIL-440QD440 W41.1 V28 V8–11—
Qcells Q.TRON BLK M-G2+ 430430 W41.3 V28 V8–11—
Qcells Q.TRON BLK M-G2.H+ 430430 W41.3 V28 V8–11—
REC Group REC460AA Pure-RX460 W68.8 V47.1 V5–6—
Elin (Sirius PV) ELNSM54M-HC-410410 W39.3 V25.3 V8–12—
Qcells Q.TRON BLK M-G2.C+ 430430 W41.3 V28 V8–11—
Tesla TSP-420420 W43.4 V27.7 V8–11—
Voltage check only, from CEC panel data and NLR weather for the city. Final design must follow the inverter manual and NEC 690.7.

Compare with similar 5 kW inverters

CEC Grid Support Inverter List (Oct 7, 2026) · building permits
InverterPowerCEC weighted eff.DC test windowUL 1741 SBLatest CECSoCal permits
ABB UNO-DM-5.0-TL-PLUS-US-SZ-RA-U5 kW–5 kW96.5%200–480 V—20200
Tesla 1538000-xx-y6.66 kW–7.68 kW98.0%270–480 VYes202174
GoodWe GEPx.x-1-US304.33 kW–11.4 kW97.0%143–500 VYes2022—
GoodWe GWxxxx-MS-US304.33 kW–9.6 kW97.0%143–500 VYes2022—
GoodWe GWxxxxA-MS5 kW–9.6 kW97.5%210–480 VYes2021—
Same type and grid voltage, power range covering this model; same fields from the same sources.

About ABB

CEC Grid Support Inverter List (Oct 7, 2026)

Other series

PVS-xx-TL-R-USPVS-xx-TL-S-R-USPVS-xx-TL-SC-R-USUNO-DM-x.x-TL-PLUS-US-SB-RA-QUNO-DM-x.x-TL-PLUS-US-SB-RA-QU

Questions & answers

How efficient is the ABB UNO-DM-5.0-TL-PLUS-US-SZ-RA-U?

The California Energy Commission lists a weighted efficiency of 96.5% for ABB UNO-DM-5.0-TL-PLUS-US-SZ-RA-U models, measured at six power levels and three DC voltages.

What sizes does the ABB UNO-DM-5.0-TL-PLUS-US-SZ-RA-U come in?

The CEC list includes 2 models from 5 kW to 5 kW AC: UNO-DM-5.0-TL-PLUS-US-SZ-RA-U, UNO-DM-5.0-TL-PLUS-US-SZ-RA-U.

Is the ABB UNO-DM-5.0-TL-PLUS-US-SZ-RA-U certified to UL 1741 SB?

The CEC list does not show UL 1741 SB certification for these models.

What is the UNO-DM-5.0-TL-PLUS-US-SZ-RA-U’s DC input voltage range?

CEC tested it at 200–480 V DC.

Sources

  1. California Energy Commission — Grid Support Inverter List (solar and battery inverters), data as of Oct 7, 2026. Manufacturer-reported, confirmed by CEC against certificates and test reports.
  2. NLR (formerly NREL) — System Advisor Model CEC inverter library (version 2026.7.3).
  3. NLR (formerly NREL) — PVWatts v8, NSRDB PSM v3 typical-year weather for Los Angeles, Palmdale, Riverside, Santa Clarita, Chula Vista, Huntington Beach.
  4. California Energy Commission — PV Module List (module electrical data for the compatibility check).
  5. Building permits — Southern California permit portals. Equipment matched from permit descriptions.
  6. Cali-Graf calculations — formulas and inputs are shown next to each calculated value (efficiency from area, temperature-corrected voltages, string sizing, energy estimates).