5.1–10.2 kWh · 3.8–11.5 kW · Lithium Iron Phosphate · direct PV input · 12 configurations
HADEYEx.x-x.xk-1P: 5.1–10.2 kWh nameplate energy; 3.8–11.5 kW continuous; lithium iron phosphate; accepts solar panels directly (DC-coupled).
| Model | Energy | Power | Grid voltage | Round trip | CEC listed |
|---|---|---|---|---|---|
| HADEYE5.1-3.8k-1P | 5.1 kWh | 3.84 kW | 240 V | — | Jul 21, 2025 |
| HADEYE5.1-4.8k-1P | 5.1 kWh | 4.8 kW | 240 V | — | Jul 21, 2025 |
| HADEYE5.1-6.0k-1P | 5.1 kWh | 6 kW | 240 V | — | Jul 21, 2025 |
| HADEYE5.1-7.6k-1P | 5.1 kWh | 7.68 kW | 240 V | — | Jul 21, 2025 |
| HADEYE5.1-9.6k-1P | 5.1 kWh | 9.6 kW | 240 V | — | Jul 21, 2025 |
| HADEYE5.1-11.5k-1P | 5.1 kWh | 11.52 kW | 240 V | — | Jul 21, 2025 |
| HADEYE10.2-3.8k-1P | 10.2 kWh | 3.84 kW | 240 V | — | Jul 21, 2025 |
| HADEYE10.2-4.8k-1P | 10.2 kWh | 4.8 kW | 240 V | — | Jul 21, 2025 |
| HADEYE10.2-6.0k-1P | 10.2 kWh | 6 kW | 240 V | — | Jul 21, 2025 |
| HADEYE10.2-7.6k-1P | 10.2 kWh | 7.68 kW | 240 V | — | Jul 21, 2025 |
| HADEYE10.2-9.6k-1P | 10.2 kWh | 9.6 kW | 240 V | — | Jul 21, 2025 |
| HADEYE10.2-11.5k-1P | 10.2 kWh | 11.52 kW | 240 V | — | Jul 21, 2025 |
| City | December | June |
|---|---|---|
| Los Angeles | 3.2 kW | 1.9 kW |
| Palmdale | 2.9 kW | 1.7 kW |
| Chula Vista | 2.7 kW | 2 kW |
| Huntington Beach | 3 kW | 2.1 kW |
| Riverside | 3.1 kW | 1.8 kW |
| Santa Clarita | 3 kW | 1.8 kW |
| Battery | Energy | Continuous power | Chemistry | Warranty | SoCal permits |
|---|---|---|---|---|---|
| Enphase Energy ENCHARGE-10 | 10.1 kWh | 3.84 kW | Lithium Iron Phosphate | 10 years | 197 |
| Enphase Energy IQ Battery 10C | 10 kWh | 7.08 kW | Lithium Iron Phosphate | — | 118 |
| Enphase Energy ENCHARGE-10T | 10.1 kWh | 3.84 kW | Lithium Iron Phosphate | 15 years | 105 |
| Qcells Q.HOME CORE Ax.xBx.x | 13.1 kWh | 7.6 kW | Lithium Ion | — | 13 |
| Qcells Q.HOME CORE Ax.xBx.x US.1 | 13.1 kWh | 7.84 kW | Lithium Ion | — | 4 |
| Enphase Energy Q Battery 10C | 10 kWh | 7.08 kW | Lithium Iron Phosphate | — | — |
5.1–10.2 kWh nameplate, per the California Energy Commission list.
Yes — the CEC list shows UL 9540 certification (certified by csa group).