2.6–20.5 kWh · 2.9–23 kW · Lithium Iron Phosphate · 8 configurations
SECU-S Series: 11.5–18.4 kWh usable energy; 2.9–23 kW continuous; lithium iron phosphate.
| Model | Energy | Power | Grid voltage | Round trip | CEC listed |
|---|---|---|---|---|---|
| SECU-S2.5 | 2.6 kWh | — | — | — | Mar 1, 2021 |
| SECU-S5 | 5.1 kWh | — | — | — | Mar 1, 2021 |
| SECU-S7.5 | 7.7 kWh | — | — | — | Mar 1, 2021 |
| SECU-S10 | 10.2 kWh | — | — | — | Mar 1, 2021 |
| SECU-S13 | 12.8 kWh | — | — | — | Mar 1, 2021 |
| SECU-S15 | 15.4 kWh | — | — | — | Mar 1, 2021 |
| SECU-S18 | 17.9 kWh | — | — | — | Mar 1, 2021 |
| SECU-S20 | 20.5 kWh | — | — | — | Mar 1, 2021 |
| Average home load | Runtime from full |
|---|---|
| 0.5 kW | ≈ 23 h |
| 1 kW | ≈ 11.5 h |
| 2 kW | ≈ 5.8 h |
| 3 kW | ≈ 3.8 h |
| 20.48 kW (full continuous power) | ≈ 0.6 h |
| City | December | June |
|---|---|---|
| Los Angeles | 3.6 kW | 2.1 kW |
| Palmdale | 3.3 kW | 1.9 kW |
| Chula Vista | 3.1 kW | 2.2 kW |
| Huntington Beach | 3.4 kW | 2.3 kW |
| Riverside | 3.4 kW | 2 kW |
| Santa Clarita | 3.4 kW | 2 kW |
| Battery | Energy | Continuous power | Chemistry | Warranty | SoCal permits |
|---|---|---|---|---|---|
| LG Energy Solution RESU 10H Prime | 9.6–16 kWh | 5 kW | Lithium Ion | — | 127 |
| Qcells Q.SAVE | 9–18 kWh | 5.5–11.1 kW | Lithium Iron | 10 years | 30 |
| Tigo Energy TSB | 9 kWh | 3.5–5.2 kW | Lithium Iron Phosphate | 11 years | 2 |
| FOXESS ECS4000-H5 | 25 kWh | 14.4 kW | Lithium Iron Phosphate | — | 1 |
| RNG International Renogy X | 20 kWh | 10 kW | Lithium Iron Phosphate | 10 years | 1 |
| Panasonic EV-Xxx | 9–18 kWh | 5.5–11.1 kW | Lithium Iron Phosphate | 12 years | — |
11.5–18.4 kWh usable, per the manufacturer datasheet.
About 11.5 hours at an average 1 kW load from a full charge (11.5 kWh usable); higher loads shorten it.
Installation location per the datasheet: indoor/outdoor.